My WebLink
|
Help
|
About
|
Sign Out
Home
2014_0616_CCpacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2014
>
2014_0616_CCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2014 1:54:21 PM
Creation date
6/12/2014 2:23:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />deliver high quality signals or comply with law. <br />No such provision Section 4(A) (4)—Conduit is to be sized to No such provision. <br />accommodate future upgrades in attempt to <br />obviate need for reopening of ROW. <br />Section 4(A) (5)—Grantee will not raise a claim No such provision. <br />that the system design and performance <br />standards are unenforceable. <br />Integration of Advanced Technology <br />No such provision Section 4(B) (1)—Grantee is responsible far No such provision <br />periodic upgrades to meet the needs and interests <br />of the community. <br />Section 8(6) – May Section 4(B) (2)—Requires Grantee to report no No such provision. <br />Require evaluations sessions at any more than every two (2) years to Commission and <br />time on 15 day written notice Member Cities on developments in technology <br />and intent to incorporate those technologies. <br />Report must include effect on use of PEG, I-Net, <br />consumer equipment. Report must report how <br />other cable companies have incorporated such <br />technology and timetable far Grantee to do so. <br />System Construction and Line Extension <br />Initial Assessment 5-27-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.