Laserfiche WebLink
<br />~v-~ <br />-' J - Mj <br /> <br />To: Planning Staff <br /> <br /> <br />From: Steven D. Gatlin, Public Works Director <br /> <br />RE: CSM CORPORATION REQUEST <br /> <br />Date: December 15, 1993 <br /> <br />In the approval of the PUD for CSM, the concept of a siqewalk was <br />discussed. Please note that the CSM project is not impacted by <br />the proposed County Road C pathway, since the proposed pathway <br />stops at Cleveland. The City's pathway project plans incorporate <br />a pathway including a 10-foot wide boulevard and a IO-foot wide <br />bituminous pathway. This pathway is intended to be constructed <br />on public right-of-way or, if insufficient right-of-way exists, <br />on right-of-way dedicated by the adjacent owner. <br /> <br />Please review all CSM plans to insure that the final site plans <br />incorporate this concept. I would also suggest that in terms of <br />financing we elect to take a cash donation for the pathway in <br />lieu of having it constructed by the developer. However, the <br />developer's site grading and planting should not interfere with <br />~~ this plan. Specifically, no bermes or landscaping should be <br />~ placed in the area planned for the future pathway. <br /> <br />--- <br />