My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02631
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2600
>
pf_02631
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 9:00:05 AM
Creation date
12/8/2004 12:13:12 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2631
Planning Files - Type
Planned Unit Development
Address
2360 COUNTY ROAD C W
Applicant
CSM CORPORATION
Status
APPROVED
PIN
082923210002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />\ ~. <br /> <br />REQUEST FOR COUNCIL ACTION <br /> <br />DATE: 12-13-93 <br />~ _ t!" <br />ITEM NO.: C. ~ <br /> <br />Department Approval: <br /> <br />UÆ~~ <br /> <br />Manager Reviewed: <br /> <br />Agenda Section: <br /> <br />~ <br /> <br />Hearings <br /> <br />Item Description: <br /> <br />CSM corporation request for PUD Concept Plan <br />Approval and preliminary Plat, Rezoning from I- <br />2 to PUD. <br /> <br />Background: <br /> <br />1. CSM is proposing to redevelop a parcel of land in Roseville <br />located south of County Road C, west of the Minnesota Transfer <br />Railway right-of-way and north of the Burlington Northern <br />Railroad right-ot-way. The site, commonly known as the <br />Ettinger property, is approximately 14 acres in size and is <br />zoned 1-2 General Industrial. The CSM proposal includes <br />demolishing a portion of the existing building, reconfiguring <br />and modifying the appearance of that building and adding two <br />office/warehouse facilities to the site. Total building square <br />footage for the site is proposed to be 212,744 sq. ft. <br /> <br />2. The site under consideration is 14.38 acres in size and is <br />zoned 1-2 General Industrial. The Comprehensive Plan <br />designation for this area is also industrial. The site is <br />currently only partially developed. The west portion of the <br />site contains a warehouse facility that was constructed in <br />1985. This facility is connected to the Ettinger Truck <br />Terminal, which was constructed in the 19401s. There is also <br />a small service garage at the south end of the site. The east <br />portion of the site is currently undeveloped. The site <br />currently consists of two tax parcels, the smallest of which is <br />not developable on its own. <br /> <br />site Area <br /> <br />Phase I <br />Phase II <br />Total <br /> <br />'-'485,553 Sq. Ft. <br />--188,383 Sq. Ft. <br />673,936 Sq. Ft. <br /> <br />~ <br /> <br />Building Area Phase I <br />Phase II <br />Total <br /> <br />159,480 Sq. Ft. <br />53,264 sq. Ft. <br />212,744 Sq Ft. <br /> <br />5 spaces/1000 sq. Ft. <br />1 space/2000 sq. Ft. <br />400 stalls (1.85/100 Sq. Ft.) <br /> <br />parking Req. Office <br />Warehouse <br />Parking Provo <br /> <br />The Planned Unit Development proposes the demolition of the <br />original truck terminal and service garage and the construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.