Laserfiche WebLink
<br />" <br />.. ..., <br /> <br /> <br />Trip,wq1 <br /> <br />Trip Generation Estimates By: Rosevllle Community Development Staff <br />Date: Dec. 9,1993 <br />Project: CSM - County Road C <br /> <br />Assumes Lot 1 : <br />Lot 2 <br />Lot 3 <br /> <br />60,000 Gross S.F, <br />96,626 Gross S,F. <br />53,265 Gross S.F. <br /> <br />Assumes a split of building space as folJows: <br />Offioe: 40,00% <br />Light Industry: 30.00% <br />Warehousing: 30,00% <br /> <br />Proposed Gross ITE Est. Trips <br />Land Use S,F. in Proposal per 1000 a,F. <br />Office 16.58 <br /> Lot 1 24,000 <br /> Lot 2 38.650 <br /> LotS 21,306 <br />Office Tota.l: 83,956 <br />Light Industry 6,97 <br /> Lot 1 18,000 <br /> Lot 2 28,988 <br /> Lot 3 15,980 <br />Light Industry Total: 62,967 <br />Warehousing 3.85 <br /> Lot 1 18,000 <br /> Lot 2 28,988 <br /> Lot 3 15,980 <br />Warehousing Tota!: 62,967 <br />Lot 1 Totals: 60,000 <br />Lot 2 Totals: 96,626 <br />Lot 3 Totals: 53,265 <br />Project Totals: 209,891 <br /> <br />EstImated <br />Total Trips <br /> <br />JrE Est. Jobs <br />oar 1000 S.F. <br /> <br />3,29 <br /> <br />398 <br />641 <br />353 <br /> <br />79 <br />127 <br />70 <br /> <br />1,392 <br /> <br />276 <br /> <br />2,16 <br /> <br />125 <br />202 <br />111 <br /> <br />39 <br />63 <br />35 <br /> <br />439 <br /> <br />136 <br /> <br />1.28 <br /> <br />69 <br />112 <br />62 <br /> <br />23 <br />37 <br />20 <br /> <br />242 <br /> <br />81 <br /> <br />593 <br /> <br />141 <br /> <br />954 <br /> <br />227 <br /> <br />526 <br /> <br />125 <br /> <br />2,073 <br /> <br />493 <br />