Laserfiche WebLink
<br />;fJ'"""r.}t~ <br />~ <br /> <br />PERMIT APPLICATION NO. 94-85. <br /> <br /> <br />9~85 <br /> <br />RICE CREEK WATEBSHED DISTRICT <br />SUITE 132 ARDEN PLAZA <br />8585 LEXINGTON AVENUE NORTH <br />ARDEN HILLS, 1DNNESOTA 55126 <br /> <br />City ot Ra.8Vi11" <br />McIntgomery WatsQn <br />In.pøotcr Elclin <br />RCWD Fl1a <br /> <br />Har-Mar-, Incorporated, 1951 University Avenue, St.. Paul. MN 55104. <br /> <br />Northeast quadrant of County Road C and Lm.coln Drive, Roseville. <br /> <br />Approval of a Final Site Drainage Plan for construction of a commercial developlij,ent <br />to be known as Ro8eville Crossings, 6:!" acres. <br /> <br />At their meeting on May 25, 1994, the Board or Managers or the Rice Creek Watershed District <br />reviewed your permit application and the recommendation of the District Engineer based upon the <br />following exhibits: <br /> <br />Issued to: <br /> <br />Location: <br /> <br />Purpose: <br /> <br />1. Permit Application, dated May 10, 1994, received May 11, 1994:. <br />2. Site plan prepared by the RUDy8D/V agel Group, last revised March 25, 1994, received May 11, <br />1994. <br />3. Grading and Drainage Plana prep&1'Ød by the Runyan/V oge1 Group, 1ast revised March 24, 1994, <br />received May 11, 1994. <br />4. Erosion control, silt fence, and pond outlet skimmer detail prepared by the Runyan/V ogel <br />Group, undated, received May 11, 1994. ' <br />5. CalcuJations for 1- and lOO-year" runoff and ponding volumes prepared by Paramount <br />Engineering and Design, last reviaed. May 25, 1994, received May 25, 1994. <br />6. Outlet control structure design detail, prepared by Paramount EngjDeeriDg and Design, dated <br />June 28, 1994, received June 28, 1994. <br />7. Cash surety in the amount of $8,000, received June 18, 1994. <br /> <br />They found the project as planned to be in acc::ordance with the Rules & Regu]ations and Guidelines <br />of the District and therefore approved the permit as requested., with the fOllowing additional <br />stipulations: <br /> <br />NO ADDITIONAL STIPULATIONS. <br /> <br />It is the responsibility of the Permittee to provide !!1l measures necessary to contam sediment on the <br />site during construction. This may require the use of erosion. control measures not outlined on the <br />erosion control plan. If this requirement is not met, the Permittee ma;r be ordered to provide additional <br />erosion control measures if deemed necessary by the District Inspector. It is also the responsibility of <br />the property owner to provide necessary maintenance to assure that the stormwater management <br />systems approved. as part of this Permit will continue to function as origiDally designed. <br /> <br />NOTE FOR PROVIDERS OF A CASH SURETY: Failure to implement and maintain the sediment- <br />erosion control and cover establishment measures outlined in the permit exhibits may result in <br /> <br />continued on reverse- <br /> <br />c9lP <br /> <br /> <br /> <br />