Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />ISD #623 - Dale Western Site <br />STS Project 95524-XB <br /> <br />3.0 CONCLUSIONS <br /> <br />Twenty-three individual disposal/debris areas were identified at the project site. Test pits were <br />performed in three of these areas for the Phase II EA. These included Areas 8 (Area A), 14 <br />(Area B) and 19 (Area C). No compounds above laboratory detection limits, except chromium, <br />were identified in the soil samples collected. The chromium concentration was within normal <br />background levels. <br /> <br />Scattered surface debris was observed in Areas 3, 4, 6, 7,9,10, 11,12, 13,15,16,18,20,21 <br />and 23. Debris within these areas can potentially be removed by hand labor. <br /> <br />More extensive surface debris was observed in Areas 1, 2, 5, 8, 17, 19 and 22. Removal of debris <br />within these areas will likely required excavation equipments. <br /> <br />Areas where debris was potentially buried includes Areas 4, 5, 8 (Area A), 14 (Area B) and 19 <br />Area C). Excavation of these areas will be required to completely evaluate the types and amounts <br />of materials within these areas. <br /> <br />- 10 - <br />