Laserfiche WebLink
<br />Independent School District 623, Roseville, Minnesota <br /> <br />Municipal Costs <br /> <br />A. Public Improvements <br /> <br />In addition to the rough grading and lot preparation, the development site needs public <br />improvements (streets, curb and gutter, lighting, water and sewer, etc.). The City has <br />provided a range of estimates for these public improvements which is estimated at <br />$3,090,000, <br /> <br />r <br />I <br />t <br />I <br />I <br />I <br />I <br />I <br /> <br /> Total Cost <br /> lQ.ts Per Lot ~ <br />High 197 $18,822 $3,708,000 <br />Low 197 $12,548 $2,472,000 <br />Targeted Assumption 197 $15,685 $3,090,000 <br /> <br />SOURCE: Original assumptions are based on information provided in the RFP and verified with City <br />staff. Final revisions were made based on disoussions with Mr. John Thein and Mr. John <br />Shard/ow on July 14, 1994. <br /> <br />B. City Fees <br /> <br />In addition to the cost of public improvements, the City has a set of prescribed fees <br />(based on project size) which will be charged to the project. City fees are estimated at a <br />total cost of $350,500. <br /> <br />Housing & Neighborhood Rehabilitation Fee: <br /> <br />. <br />I <br />I <br />} <br />J <br />J <br />J <br />l <br /> <br /> # of Fee <br />Type of Home .u.nim Per Unit IQ1a1s <br />Single Family Homes 100 $2,500 $250,000 <br />Townhouses .....a.z 1.000 97.000 <br />I Total 197 $1,761 $347.000 <br />1 Zoning Application: $2,000 <br />Permits & Inspections: $1,000 <br />(Rough Grading) <br /> <br />SOURCE: Original assumptIons are based on information provided in the RFP and verified with City <br />staff. Final revisions were made based on disoussions with Mr. John Thein and Mr. John <br />Shardlow on July 14, 1994. <br /> <br />~ SPRINGSTED <br /> <br />Page 6 <br />