Laserfiche WebLink
<br />(8) Sidewalk on one side of main streets through development. <br /> <br />(9) Proof of park (in the form of cash or land as determined by the City) in case <br />stormwater runoff prevents use of park as contemplated. <br /> <br />(10) Staff work with developer to provide proper screening and landscape buffers <br />between development and existing development. <br /> <br />(11) Relevant portions of deed covenants be incorporated into PUD agreement to <br />insure proper maintenance and architectural control. <br /> <br />(12) Monument sign, townhome design, storm water solution design be reviewed at the <br />April 1995 Planning Commission meeting. <br /> <br />2. Motion to approve the Subdivision Agreement between the City of RosevilIe and <br />Independent School District #623 with the following conditionst subject to document <br />review by the City Attorney and approval by the City Managert and signature by <br />the Mayor. <br /> <br />(1) All wetlands to be platted as outlots and deeded to the City, and easements shall be <br />provided for the maintenance of all NURP basins and drainage improvements. <br /> <br />(2) Trail connections to be provided to the neighborhood park from the proposed <br />sidewalk along the main through street in the development and to provide access <br />to the Judith Avenue neighborhood. These trails shall be dedicated on the plat as <br />pedestrian rights-of-way and the specific locations and design shall be determined <br />in cooperation with the Parks Commission and staff. <br /> <br />(3) The proposed cul~de-sacs in the townhome areas shall be 28 foot streets located <br />within 60 foot rights-of-way, The cul~de-sacs shall be modified to a "tear drop <br />shape" to facilitate maintenance and be located on 120 feet wide rights-of-way. <br /> <br />(4) Proof of park (in the form of cash or land as determined by the City) in case <br />stonnwater runoff prevents use of park as contemplated. <br /> <br />(5) Dedication of all utility and ponding easements. <br /> <br />(6) Review of erosion control measures by Ramsey Soil and Water. <br /> <br />(7) That 120 foot diameter right-of~way be provided on all public cul-de~sacs. <br /> <br />(8) That a final stormwater outlet design to Lake Owasso be approved by staff. <br /> <br />(9) That final street and utility plans, including recommended changes to the utility <br />plans contained in this report, be approved by staff. <br /> <br />(10) That the street names be modified per the Engineering Department's review. <br /> <br />4 <br />