Laserfiche WebLink
<br />diameter. <br /> <br />The northeast townhome site is served by a main north/south roadway that is proposed to <br />be 32' in width on a 60-foot right~of-way. A short street with two cul-de~sacs will extend <br />to the east from this main north/south road. The developer is proposing to build this <br />segment at 28' on a 50-foot wide right-of-way. In order to meet City standards, the road <br />should be constructed at 32' on a 60-foot right-of-way. They are aJso proposing <br />landscape islands in these cul-de-sacs which will need to meet the same criteria as the cul- <br />de-sacs for the single-family project. The townhome development on the southwest <br />corner of the site is served by a 28-foot wide street on a 50-foot wide right-of~way and a <br />cul-de-sac with planter island, Again, this segment must meet the same standards of a 32~ <br />foot wide street on a 60~foot right~of-way and a 1 DO-foot diameter cul-de-sac on a 120 <br />foot diameter right of way. The planter island should be 50' in diameter. <br /> <br />The street grades within the project range from just under I % to a maximum of 6% which <br />is consistent with the City's standards. <br /> <br />The developer is proposing sidewalks on the north side of the main road and along one <br />side of the north/south road to the Roberts property. The proposed 6-foot sidewalk will <br />be on a 60~foot right-of-way with a 32~foot wide street which will provide an 8-foot wide <br />boulevard between the sidewalk and the street. <br /> <br />The developer is proposing to install ornamental street lighting within the project. It is <br />also necessary to install a light standard and fixture that can be maintained by NSP. This <br />standard must also be approved by NSP. <br /> <br />The entry monuments which are proposed must be identified and dimensioned on <br />drawings to determine the impacts to site distance at the intersections. <br /> <br />Although it is not part of this project, the access to Western Avenue across the Grauel <br />property is a concern of staff. The City is planning to retain a traffic engineer to evaluate <br />potential access points at this intersection, It is not necessary to delay this project for a <br />solution to that intersection. <br /> <br />Storrnwater/W etlands <br /> <br />Currently, the entire school district property is landlocked with regard to stormwater <br />drainage. That is, surface water does not drain off the site. Rather, the stonnwater is <br />collected in a number of wetland basins from which it percolates into the ground. One <br />wetland, noted as Wetland Basin 5, is actually 16 feet below the nonnal water elevation of <br />Lake Owasso. <br /> <br />Four wetlands, noted as Wetland Basins 1, 3, 5, and 6 exist on the site, Wetland Basin 3, <br />approximately 4.5 acres, is a Department of Natural Resources protected wetland (DNR <br />138W), All of the wetlands on the site are protected by the Army Corps of Engineers and <br />the Wetland Conservation Act. <br /> <br />In addition to the stormwater generated on~site, approximately 100 acres of off-site <br /> <br />9 <br />