Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: July 22, 2014 <br />Item Description: Communication Items <br />Item No: 4 <br />Projects update: <br />• 2014 Sanitary Sewer Lining Project—This project is about 90 % complete. Work remains <br />on one segment of County Road B-2, Larpenteur Avenue, and an easement through <br />Central Park. Once Ramsey County is done with their Larpenteur concrete rehabilitation <br />project, the contractor will be able to access and complete the lining. The easement work <br />is scheduled for winter work (or frozen ground), to minimize turf damage through Central <br />Park. <br />• County Road B2 Sidewalk Construction — This project consists of constructing a 6 foot <br />sidewalk along the north side of County Road B2 from Lexington Ave to Rice Street as <br />well as along Victoria Street from County Road B2 north to County Road C. Concrete <br />curb and sidewalk is being installed on the first segment, between Lexington and <br />Victoria, and concrete curb is being installed along the east side of Victoria north of <br />County Road B2. The contractor will then begin restoration on the first segment, and <br />continue prepping the second segment for sidewalk. The sidewalk will be complete <br />before the start of school with some restoration and other minor work occurring after that. <br />• 2014 PMP- This project is well underway. The work along Ridgewood Lane and <br />Oakcrest Ave is complete. With the exception of the areas in the northwest portion of the <br />City and Dellwood Ave milling and paving operations are complete. The final areas are <br />waiting for the new storm sewer and drainage improvements to be complete. The City is <br />installing some substantial storm water retention and treatment devices in the northwest <br />corner of the City (Stanbridge St and Manson St) and at Dellwood St and Sherren St <br />behind the Roseville library to address some historic drainage issues. More information <br />on these aspects of the project are attached. Work will begin the week of July 21" on the <br />Stanbridge and Manson system. Work on the Dellwood and Sherren system will begin <br />early to mid August. <br />Snelling Ave Bus Rapid Transit: Earlier this month the Metropolitan Council approved <br />the Proposed Plan for the A Line (Snelling Ave) Bus Rapid Transit service. This line will <br />run between Rosedale and the 46th Street station of the Blue Line LRT along Hiawatha <br />Ave. As a part of the proposed plan, the previously planned Roselawn station will be <br />"deferred" in favor of a station at Hoyt/Nebraska where ridership numbers are <br />significantly higher. It is unclear what the timing would be for consideration of a station <br />at Roselawn if it is not installed in this first phase. The Roseville City Council will be <br />considering a resolution of support for the Roselawn station to be included in phase one <br />of this project on Monday, July 21st. Staff will provide an update of that discussion at the <br />PWETC Commission meeting Tuesday night. <br />