My WebLink
|
Help
|
About
|
Sign Out
Home
2014-07-22_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2014
>
2014-07-22_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2014 4:21:13 PM
Creation date
7/17/2014 4:18:08 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
7/22/2014
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 1-35W Interchange Project: Neat week staff anticipates receiving several proposals for <br />engineering services for the design and construction of a revised intersection and <br />interchange for the northbound ramps to 1-35W at Cleveland Ave. Scoring will occur in <br />early August with a projected award by Council on August 111'. We anticipate being <br />under construction in 2015. This project also received federal funds that will pay for <br />about 80% of the estimated $1.5 million cost. <br />• Staff will discuss what we found regarding bicycles on sidewalks and whether they are <br />prohibited at the meeting. <br />• Staff will also give the Commission a summary of the City Manager's recommended <br />budget. <br />• Greenstep Cities action by the Council. <br />Maintenance Activity: <br />• Staff continues to sweep spot locations on an as needed basis. <br />• Staff has been spending a significant amount of time monitoring and cleaning drainage <br />infrastructure due to the number of rainfall events. <br />• Street maintenance staff is spending a significant amount of time mowing boulevards and <br />maintaining streetscape areas. <br />• Seasonal street maintenance activities continue with general patching operations as well <br />as crack sealing. <br />• Street crews will begin preparing the County Road B shoulder widening for a pedestrian <br />facility in the next two weeks. <br />• Utility crews continue with preventive maintenance activities including hydrant and gate <br />valve repairs, meter installations, and sewer jetting (cleaning) operations. <br />Attachments: <br />A: 2014 Project Map <br />B: 2014 Sewer Lining Map <br />C: 2014 PMP Storm Water Improvements Information <br />
The URL can be used to link to this page
Your browser does not support the video tag.