Laserfiche WebLink
<br />200-2 <br /> <br />Drawinas - The drawings and plans which show the character and <br />scope of the Wor~ to be performed and which have been prepared <br />or approved by the ENGINEER and are referred to in the Contract <br />Documents. <br /> <br />ENGINEER - The Director of Public Works and other Engineers <br />named as such in the Agreement. <br /> <br />Modification - Any written amendment of any of the contract <br />Documents (including change Orders) duly executed and delivered <br />after execution of Agreement. <br /> <br />Notice of Award - The written not.ice by OWNER to the apparent <br />successful bidder stating that upon compliance by the apparent <br />successful bidder with the,conditions precedent enumerated <br />therein, within the time specified. OWNER will sign and deliver <br />the Agreement. <br /> <br />Notice to Proceed - A written notice given by OWNER to <br />CONTRACTOR (with a copy to ENGINEER) fixing the date on which <br />the contract Time will commence to run and on which CONTRACTOR <br />shall start to perform CONTRACTOR'S obligations under the <br />contract Documents. <br /> <br />OWNER - The City of Roseville, for whom the Work is to be <br />performed. <br /> <br />Project - The entire constrUction to be performed as provided <br />in the Contract Documents. <br /> <br />Project Representative - The authorized representative of the' <br />ENGINEER who is assigned to the project or any parts thereof. <br /> <br />~bop Drawings - All drawings, diagrams, illustration~, <br />brochures, schedules and other data which illustrate the <br />equipment, material and work to be furnished by the CO~TRACTOR. <br /> <br />Specifications - The Instructions to Bidders, these General <br />conditions, the special 'Conditions. <br /> <br />subcontractor - An individual, firm or corporation having a <br />direct contract with the ,CONTRACTOR or with any other Subcon- <br />tractor for the performance of a part of the Work at the site. <br /> <br />~pbstantial Completion - The point of time when all contract <br />work, with the exception of minor cleanup and punch list items, <br />bas been completed~ In the case of street work, this includes <br />the placement of the bituminous wear course and placement of all <br />sod and landscape materials. ' <br /> <br />Work - Any and'all obligations, duties and resp~~si~ilities <br />necessary to the successful completion of the Project assi9ne~ <br />to or undertaken by the CONTRACTOR under the Contract Documents, <br />including the furnishing of all labor,. materials, equipment and <br />other incidentals. <br /> <br />~ <br />II <br />f' <br />t <br /> <br /> <br />, <br /> <br />{I <br />tl <br />\1 <br />(t <br />II <br /> <br /> <br />I <br /> <br />)1 <br />rt <br />(I <br /> <br />, , <br /> <br /> <br />rl <br />{I <br />t <br /> <br />'i <br />l. <br />11 <br />t. <br />!I <br />\1 <br />