Laserfiche WebLink
<br />'II- <br />I'" <br />1tl' <br />Jj <br />f,l <br />t' <br />I, <br />!I <br />!, <br />tl <br />II <br />I, <br />(J <br />! <br />If' <br />, ' <br /> <br />200-3 <br /> <br />Workl!1g Dav - A calendar day, exclusive of Sat.urdays, sundays, <br />and 8tate.~ecognized legal holidays, on which weather and other <br />'conditions~not under the control of the CONTRACTOR will permit <br />. construc~ion operations to proceed for at. least two hours of the <br />day with the normal worJdng force engaged in. performing the <br />controlling item or items of work which would be in progress at <br />that time~ Frac1;lonal working days will be counted for those <br />days where it is possible to work two hours or more but less <br />than eig~t,ho~rs. <br /> <br />202.000 K9DIfICATION 9F PROPOSAL <br /> <br />The OWNER reserves the right to modIfy the Plans, specifications, <br />special Conditions or proposal at any time, subject to the <br />following con~itions: <br /> <br />(1) Such modification will be made by an Addendum, duly <br />numbered and dated. <br /> <br />I.~ <br />fJ <br />I <br />il <br />II <br />1.1' <br />! . <br /> <br />(2) Such Addendum will be mailed by certified United states <br />mall or will be sent by telegram to each, prospective bidder <br />who has received a proposal prior to the date of the, <br />Addendum; and <br /> <br />(3) Such Addendum will be attached to all proposals issued <br />after the date of the Addendum and shall remain a part <br />thereof. <br /> <br />203.. 0 A,WARD E~ECUTION OF DOCUMENTS, DELIVERY J)F BONDS. ETC. <br /> <br />203.1 The award of the Contract, if it is awarded, will be to the <br />lowest responsible Bidder whose qualifications indicate 'the <br />award'will be in the best interests of the OWNER and whose <br />proposal complies with all the prescribed requirements. The <br />OWNER reserves the right to reject any and all bids. In <br />analyzing Bids, the OWNER may take into consideration <br />alternates and unit prices, if requested by, the Bid forms. If <br />the contract is awarded, the OWNER will qive the successful <br />Bidder written notice of the award 'within thirty days after the <br />opening of the Bids. <br /> <br />At least three copies ot the Agreement and such other contract <br />Documents as practicable will be signed by the OWNER and the <br />CONTRAC1'OR. The ENGINEER will 'identify those ,portio~s of the <br />contract .Documents not so signed and-such identification will <br />be binding on all parties.. The OWNER, the CONTRACTOR and the <br />ENGINBER,will,each'rec.ive an executed copy of the Contract <br />Documents. <br /> <br />203.2 <br /> <br />203.3 <br /> <br />simultaneously with the ex~cution of the Contrac~ Documents, <br />the CONTRACTOR 'shall deliver to the' OWNER' the required. bonds and <br />certificates of insurance. <br />