Laserfiche WebLink
<br />207.0 <br /> <br />207.1 <br /> <br />207.2 <br /> <br />207.3 <br /> <br />208.0 <br />208.1 <br /> <br />200-8 <br /> <br />within the Specifications the order of precedence shall be as <br />follows: <br /> <br />Special Conditions, Instructions to "Bidders, General <br />Conditions, $tandard specific~tions . <br /> <br />Figure dimensions on Drawings shall ,govern over scale <br />dimensions, and detailed Drawings shall govern over General <br />Drawings. Any work that may be reasonably inferred from the <br />Specifications or. Drawings "as being, required to produce the, , <br />intended result shall be supplied whether or not it is ' <br />specifically-called for. Work, materials or equipment described <br />in words which so,applied.have a well-known technical or trade <br />meaning shall be deemed ,to refer to such recognized standards. <br /> <br />The CONTRACTOR assumes fully responsibility for having <br />familiarized himself with the nature and the extent of the <br />contract Documents, Work, Locality, and Local Conditions that <br />may in any manner affect the Work to be done. <br /> <br />OWNERSHIP AND COPIES OF DOCUMENTS: "CONSTRUCTION RECORD <br />DRAWINGS" <br /> <br />All Specifications, Drawings and copies thereof furnished by the <br />OWNER shall remain his property. They shall not be used on <br />another Project, and, with the exception of those sets which <br />have been signed in connection with the execution of the <br />Agreement, shall be returned to bim'on request upon completion <br />of the Project. <br /> <br />The OWNER will furnish to the CONTRACTOR up to ten copies of ,the' <br />specifications and Drawings as are reasonable necessary, for the <br />execution of the Work. Additional copies will be turnished, <br />upon request, at the cost of reproduction. <br /> <br />The CONTRACTOR shall keep one copy of all Specifications, <br />Drawings, Addenda, Modifications, and Shop Drawings in good <br />condition at the site which shall be, ,annotated to show all <br />changes made during the construction prooess. These shall be <br />available to the ENGINEER and shall be delivered to him'for the <br />OWNER upon completion of the proj ect'. <br /> <br />SUBCONTRACTS <br /> <br />Prior to the award of the Contract, and when reques't-ed, the <br />successful Bidder shall submit to the OWNER and the ,ENGINEER <br />the names of the proposed Subcontractors for those portions of <br />the Work for whioh the Subcontractors must be identified and <br />submitted as ,specified in.the Contract Documents. The <br />CONTRACTOR shall.not employ any Subcontractor'(whether initially <br />or as a s\l1)stitute) against whom the QWNER or the 'ENGINEER-.may <br />have reasonable objection, nor.shall the CONTRACTOR be required <br />to employ any Subcontractor against whom he has reasonable <br /> <br />~. <br />{i <br />~ <br />- <br /> <br />'\ <br /> <br /> <br />- <br />It <br />(I <br />(I <br />II <br />If <br />t <br />. <br />tJ <br />it <br />(. <br />;, <br />t' <br />\1 <br />t* <br />