Laserfiche WebLink
<br />600-4 <br /> <br />I'; <br />I, <br />IJ <br />I; <br />II <br />Ii <br />Ii; <br />I <br />I <br />. <br />I <br />.1 <br />I <br />I <br />I <br />t. <br />I <br />,I <br />-J <br /> <br />.Wben'excavatio" is encountered that is unsuitable for backfill, <br />it shall be removed as directed by the ENGINEER. <br /> <br />603.200 Preparation of Soil Durinq Pipe ~vin9 <br /> <br />At the time of pipe placement, the bedding conditions shall be <br />such as to provide uniform and continuous support for the pipe <br />between bell holes. Bell holes shall be excavated as necessary <br />to make the joint connections, but they shall be no larqer than <br />would be adequate. No pipe material shall be laid in water nor <br />when the trench or bedding conditions are otherwise unsuitable <br />or improper. <br /> <br />If trench bottom conditions are encountered which appear to <br />require stabilization, the ENGINEER shall be informed. The <br />trench conditions shall be examined by the ENGINEER to determine <br />the nature of such inst.ability, employing the services of a <br />testing laboratory if necessary. If it is determined that the <br />trench bottom cannot support the pipe, D. further depth and/or <br />width shall be excavated and refilled to the pipe foundation <br />grade with granular foundation material and thoroughly <br />compacted. <br /> <br />If the examination by the ENGINEER reveals that the afore- <br />described conditions are caused by the CONTRACTORIS manipulation <br />of the soils in the presence of excessive moisture, or lack of <br />proper dewatering, the CONTRACTOR shall take such steps as are <br />necessary to stabilize the trench bot.tom including the use of <br />pipe support material, and improved dewatering methods. In such <br />case, the cost of measure necessary shall be borne by the <br />CONTRACTOR. " <br /> <br />When the bottom of the trench consists of, a material suitable to <br />properly support the pipe the following methods of bedding shall <br />apply: . <br /> <br />(1) <br /> <br />, (2) <br /> <br />(3) <br /> <br />Granular bedding material will be placed below the midpoint <br />of the 'pipe, prior to pipe installation, to facilitate <br />proper shaping and achieve uniform pipe support, using hand <br />compaction methods. <br /> <br />Granular backfill material at pipe zone shall be free from <br />rook, boulders or other unsuitable sUbstances and shall be <br />deposited into the trench simultaneously on both sides of <br />pipe for the full width of the trench in six-inch lifts <br />thoroughly compacted to a minimum elevation, ,of one foot <br />above the top of the pipe. Compaction shall be accom- <br />plished by mechanical ta1llpinq. <br /> <br />The qranular backfill material shall be placed to the top <br />of the trench of street subgrade elevation in level, <br />successive layers, having a thickness of not greater than <br />12 inohes. Each successive layer shall be thoroughly <br />compacted as specified prior to' the placement or addi- <br />tional layers. If the specified aompaction is not being <br />