Laserfiche WebLink
<br />i~ <br />{~ <br />".J <br />J <br />-,J <br />~'I <br />..J <br /> <br />JI <br />" <br />IJ <br />IJ <br />t"1 <br /> <br />;;J <br /> <br />11 <br />.... <br />JI <br />_:11 <br />JI <br />JI <br />JI- <br />jl <br />JI <br /> <br />700-3 <br /> <br />7 03 .~4i"i ,CONCRETE CURBIlfG <br /> <br />Conorete curbing shall be done in accorqance with Minnesota <br />Department of Transportation Specification 2531 except as <br />modified below: . , <br /> <br />Section 2531 of the Minnesota Department of Transportation <br />specifications shall be amended to require a S-day curing time <br />for all concrete curb and gutter and driveway aprons. <br /> <br />Transverse expansion joints, filled with 1/2 inch pre-formed <br />joint material, shall be placed at the ends of all curved <br />sections; at the ends of the curved portions of entrance and <br />street returns, and three feet on each side of all catch basins. <br /> <br />Section 2531 of Minnesota.Department of Transportation <br />specifications shall be modified to delete the option for the <br />, contractor to accept reduced payment ~or unacceptable work. <br /> <br />Unacceptable work shall be removed an~ be replaced with <br />acceptable work as ordered by the ENGINEER. <br /> <br />SEEDING <br /> <br />703.5 <br /> <br />703.6 <br /> <br />After placement of topsoil on the boulevard areas, they shall be <br />seeded according to Minnesota Department of Transportation 2575. <br />Seed shall be Mixture NO.6, the application rate shall be <br />150#/acre and the fertilizer shall be analysis 12-12-12. <br /> <br />JmSTORATION OF $URFACE DIP~QYPE1tTS <br /> <br />" <br /> <br />Wherever any surface improvements such as pavement, curbing, <br />pedestrian walks, fencing, or turfing have been removed, damaged <br />or otherwise disturbed by the CONTRACTOR's operation,: they shall <br />be repaired or replaced to the ENGINEER's satisfaction, as will <br />restore the improvement in kind and structure to the pre-existing <br />condition. Eaoh item of restoration work shall be done as soon <br />as practicable after completion of installation and backfilling <br />operations on each section of work. <br /> <br />In the absence of specific payment provisions, as separate <br />COntract Items, the restoration work shall be compensated for <br />as part of the work required under'those Contract Items which <br />, necessitated the destruction and replacement or 'repair, and <br />there will be no separate payment therefore. If separate pay <br />items are provided for restoration work, only that portion of <br />the repair or reconstruction which was necessitated by the <br />contract work will be measured for. payment. Any improvements <br />removed or damaged unnecessarily shall be replaced or repa~red <br />at the CONTRACT~R's expense. <br /> <br />Any improvements the ENGINEER considers obsolete or no longer ,1.n <br />service will not have to be restor~d. No replacement will be <br />