Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />0910 - SPECIAL CONDITIONS <br /> <br />1. CITY OF ROSEVILLE STANDARDS <br /> <br />All work shall comply with the current standards if the city <br />of Roseville. <br /> <br />2. PRECONSTRUCTION AND PROGRESS ~EETINGS <br /> <br />Upon award of the contract 'to the Contractor, the Engineer <br />shall schedule a preconstruction conference at a time and <br />location as determined by the Engineer. In addition, the <br />Engineer may schedule progress meetings to be held at a local <br />location during working hours. The Contractor shall have in <br />attendance at the preconstruction conference and the progress <br />meetings, representatives of his company and of this <br />subcontractors who have the authority to make commitments for <br />the Contractor and subcontractors. <br /> <br />3. MATERIAL STORAGE <br /> <br />The Contractor shall locate a site at the project to store <br />his materials and equipment in such a manner that a minimum <br />of congestion will result. The placing of said materials and <br />equipment shall be subject to the approval of the Owner. <br /> <br />The Contractor shall provide such construction sheds and <br />storage sheds as he may require at his own expense. <br /> <br />The Contractor shall maintain his storage site during <br />construction and clean it after the site use is discontinued. <br /> <br />4. DRAWINGS AND SPECIFICATIONS OF THE WORK <br /> <br />The Contractor shall keep one copy of all drawings and <br />specifications on the work in good order, available to the <br />Engineer and to his representatives. All drawings on the <br />work shall bear the Engineer's approval. <br /> <br />5. PRIME CONTRACTOR SUPERVISION <br /> <br />The prime Contractor shall furnish a full-time superintendent <br />who is acceptable to the Engineer and Owner. The <br />superintendent shall have authority to make decisions on <br />behalf of the Contractor and shall coordinate and control all <br />subcontractors. ' <br /> <br />6. CONSTRUCTION SEOUENCING <br /> <br />The Contractor shall submit a construction schedule for <br />approval prior to beginning construction. The Contractor <br />shall schedule his work to provide a very minimum amount of <br />disruption to traffic, commerce, and residences. <br /> <br />0910-1 <br />