Laserfiche WebLink
<br />20. STREETS TO BE KEPT CLEAN <br /> <br />streets that are being. used by the Contractor and his forces <br />to and from, as well as in the project site, shall be kept <br />clean and dust free at all times for the duration of the <br />project and at project completion. Only methods approved by <br />the Engineer shall be used to keep the streets clean. <br /> <br />The Contractor shall have sweeping equipment and water trucks <br />on the project site to con~rol the dust. In lieu of this <br />requirement, the Contractor may arrange to have the streets <br />swept and maintained on a regular basis by others. <br /> <br />0910-8 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />