<br />ROSE VILLA <br /> <br />EROSION CONTROL IMPLEMENTATION SCHEDULE <br /> <br />ITEM <br /> <br />INSTALLATION <br /> <br />Sedimentation Basin <br /> <br />Before Main Grading <br /> <br />silt Fence <br /> <br />Prior to Any construction <br /> <br />Catch Basin straw <br />Bale Facilities <br /> <br />As Catch Basin is <br />Constructed <br /> <br />Rock Entrance <br /> <br />Prior to Hauling <br /> <br />Riprap <br /> <br />When Outlet is Installed <br /> <br />outlet Control <br /> <br />After Pond is Constructed <br /> <br />Revegetation <br /> <br />As Areas Are Completed <br />and Topsoil Spread <br /> <br />REMOVAL <br /> <br />To Remain <br /> <br />By others <br /> <br />When street <br />is Built <br /> <br />When Paved <br /> <br />Permanent <br /> <br />Permanent <br /> <br />Permanent <br /> <br />The Contractor shall inspect and make repairs to all erosion <br />control systems after each rainfall. He shall remove all <br />accumulated silt and repair wash-out areas. <br /> <br />2270-2 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />