<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />2270 - EROSION CONTROL <br /> <br />1.0 GENERAL <br /> <br />This section covers permanent and temporary erosion control <br />measures to be established during construction. Erosion <br />control shall be in accordance with the Ramsey county Soil <br />and Water conservation District requirements as published by <br />the soil Conservation Service. <br /> <br />2.0 PRODUCTS <br /> <br />2.1 silt fence - As per ses Fact Sheet Eng-1, silt Fences, <br />November 1987. <br /> <br />2.2 Bale Ghecks - As per ses Fact Sheet Eng-2, Straw Bale <br />Sediment Trap, November 1987. <br /> <br />2.3 Tempo~ary Rock Construction Entr~nce - As per ses Fact <br />Sheet Eng-4, Temporary Rock Construction Entrance, <br />November 1987. <br /> <br />2.4 storm Drain Inlet PrQtectign - As per SCS Fact Sheet <br />Eog-5, Storm Drain Inlet Protection, November 1987. <br /> <br />2.5 Dust Control - As per ses Fact Sheet Eng-6, Dust <br />Control, November 1987. <br /> <br />2.6 Outlet protection - As per ses Fact Sheet Eng-7, Outlet <br />protection, November 1987. <br /> <br />2.7 Sediment Basin - As per ses Fact Sheet Eng-a, Diversion, <br />November 1987. <br /> <br />3.0 'EXECUTION <br /> <br />prior to commencing any site or demolition work, the <br />Contractor shall install all erosion control systems as shown <br />on the plans. As the work progresses, the Contractor shall <br />install and maintain the erosion control measures as <br />indicated in the following implementation schedule: <br /> <br />2270-1 <br />