Laserfiche WebLink
<br />lounge for s. w. resident wing,) <br />F. Special Care Wing: <br />· convert so. half of east res. lounge to a 2-bed room. <br />· convert two other (admin. 's choice) 2 bed rooms to two singles, (still maintain <br />existing shared toilets?) <br />· eliminate existing fire place to allow for new relocated 2-bed room. <br />G. Second floor remodel: <br />. no changes <br />H. Activity Room: <br />· reduce size for new corridor to east exit/delivery entrance, <br />· install dietary walk-in cooler/freezer and food storage into west section (to <br />eliminate these items being in the basement), <br />I, Special care yard area: <br />. maintain existing landscaping <br />· replace existing patio slabs with new and correct slope (reduce fall) <br />· add sidewalk extension around east tress and trees at new public sidewalk <br />. use new white reinforced fencing and use 6' 0" height <br /> <br />NEXT STEP: CENTER <br />1, Review revised schematics in one week. <br />2. Request another 6 mo, extension to the sideyard variance (consultant to send,letter with <br />schedule to the center). <br /> <br />NEXT STEP: CONSULTANT <br />1, Follow-up on all items #1, review schematic changes, review revised estimate when complete <br />and progress with construction drawings. <br />2, Follow-up on State review of changes proposed, <br />3, Send schedule letter Paula <br />4. Select project engineers with architect. <br /> <br />Steve Halvorsen <br />Con~tructionlDesign Consultant <br /> <br />c jerry Nugent, Regional Director <br />Dave Horazdovsky, VP Operations & C.O,Q. <br />Dennis Beeman, VP Advancement, Development & Planning <br />Greg Amble, Div. Director Project Development <br />Lenny Kemnitz, Dir. ConstructionlDesign & Environmental Services <br /> <br />--.-------- <br />