My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02778
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2700
>
pf_02778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:09:23 PM
Creation date
12/8/2004 12:40:34 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2778
Planning Files - Type
Variance
Address
1415 COUNTY ROAD B W
Applicant
GOOD SAMARITAN CENTER
Status
APPROVED
PIN
032923310027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />lounge for s. w. resident wing,) <br />F. Special Care Wing: <br />· convert so. half of east res. lounge to a 2-bed room. <br />· convert two other (admin. 's choice) 2 bed rooms to two singles, (still maintain <br />existing shared toilets?) <br />· eliminate existing fire place to allow for new relocated 2-bed room. <br />G. Second floor remodel: <br />. no changes <br />H. Activity Room: <br />· reduce size for new corridor to east exit/delivery entrance, <br />· install dietary walk-in cooler/freezer and food storage into west section (to <br />eliminate these items being in the basement), <br />I, Special care yard area: <br />. maintain existing landscaping <br />· replace existing patio slabs with new and correct slope (reduce fall) <br />· add sidewalk extension around east tress and trees at new public sidewalk <br />. use new white reinforced fencing and use 6' 0" height <br /> <br />NEXT STEP: CENTER <br />1, Review revised schematics in one week. <br />2. Request another 6 mo, extension to the sideyard variance (consultant to send,letter with <br />schedule to the center). <br /> <br />NEXT STEP: CONSULTANT <br />1, Follow-up on all items #1, review schematic changes, review revised estimate when complete <br />and progress with construction drawings. <br />2, Follow-up on State review of changes proposed, <br />3, Send schedule letter Paula <br />4. Select project engineers with architect. <br /> <br />Steve Halvorsen <br />Con~tructionlDesign Consultant <br /> <br />c jerry Nugent, Regional Director <br />Dave Horazdovsky, VP Operations & C.O,Q. <br />Dennis Beeman, VP Advancement, Development & Planning <br />Greg Amble, Div. Director Project Development <br />Lenny Kemnitz, Dir. ConstructionlDesign & Environmental Services <br /> <br />--.-------- <br />
The URL can be used to link to this page
Your browser does not support the video tag.