Laserfiche WebLink
<br />" <br /> <br />a. Catch basins need to be placed on both sides of the driveway entrance to pick up <br />the drainage before it runs into the City street. <br /> <br />b. The existing fire hydrant at the northwest corner of the lot will have to be <br />relocated to the south or a paved area from the parking lot to the hydrant will have <br />to be provided for fire truck operations. <br /> <br />c. A sidewalk along Snelling frontage road is required. <br /> <br />d. That overstory landscape materials be provided along the south perimeter of the <br />parking lot. <br /> <br />e. That the landscape plan comply with Section 1010.09 (80% opaque, 5 feet high <br />screening in any commercial area that is adjacent to a residential area). <br /> <br />Staff Report by: Michael Falk <br /> <br />5 <br />