Laserfiche WebLink
<br />9. The City stormwater management policy states that the run-off rate in a 10-year storm <br />under developed conditions not exceed the run-off rate in aiD-year storm undeveloped <br />conditions. The applicant has proposed a pond for the southeast comer of the site. The <br />pond must meet this requirement and have enough volume to contain the 1 DO-year event. <br />The pond shown appears to meet this criteria. However, the applicant must submit <br />drainage calculations signed by a professional engineer to confirm this. <br />10. The owner should work with his employees to develop a plan in an event that a fuel spill <br />occurs on site. It is desired to minimize the amount of fuel that would enter the City's <br />storm sewer system should a fuel spill occur. <br /> <br />Summary and Staff Conclusion: <br /> <br />I. In order of magnitude, the Kath application must be looked at first as a request to amend <br />the Comprehensive Land Use Guide Plan, secondly as a rezoning and PUD plan approval <br />and finally as a request for a conditional use permit and preliminary and final plat. In <br />reviewing the goals and policies contained in the City's Comprehensive Land Use Guide <br />Plan, it is staff s interpretation that the goals and policies listed above support an <br />amendment to the Comprehensive Land Use Guide Plan, especially when taken in <br />concert with the proposed B-1 zoned lot. The goals and policies cited show consistency <br />with the City's Comprehensive Land Use Guide Plan. Careful planning and attention to <br />details can develop a project with a human scale and a sensitivity to the surrounding <br />neighborhoods. <br /> <br />2. Minnesota State Statutes make it clear that City zoning ordinances and maps must be <br />consistent with their Comprehensive Land Use Plans. Therefore, if the amendment to the <br />Comprehensive Plan is approved, the rezoning would also be appropriate. <br /> <br />3. Concerning the conditional use permit and General Concept PUD Plan approval, the <br />applicant has demonstrated compliance with the City's design standards and special <br />standards related to motor fuel stations with their proposed development plans. A review <br />of the 6 criteria considered with the issuance of a conditional use permit points out that <br />these criteria are not black and white, but instead tend to be rather gray. The goals and <br />policies cited show consistency with the City's Comprehensive Land Use Guide Plan. <br /> <br />4. Given the intensity of this use, there will be some impact such as increased traffic turning <br />movements, hours of operation, site lighting and noise levels that must be weighed very <br />carefully. As previously discussed there will be on site traffic circulation problems. While <br />there is capacity in the street system, traffic and turning movements will be the most <br />notable change with this project. It would seem that current market values for <br />surrounding properties could only be helped by the removal and replacement of the <br />dilapidated buildings and vacant lots. In the longer term, however, it is more difficult to <br />provide such certainty. The new, revitalized Kath investment may increase the <br />commercial value of the other three comers for auto dependent uses. While these criteria <br /> <br />9 <br />