My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02823
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2800
>
pf_02823
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:13:48 PM
Creation date
12/8/2004 1:20:07 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2823
Planning Files - Type
Division of Land
Address
350 OWASSO BLVD S
Applicant
TSCHIDA, FRANK
Status
APPROVED
PIN
012923130090
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TSCHIDA OW ASSO HILLS PLAT 4 <br /> <br />F. Connect to Existing Sewer - Payment shall be at the contract unit price for each <br />connection to the existing sewer. <br /> <br />G. Granular Foundation Material - Payment shall be at the contract unit price per <br />cubic yard of material furnished and installed. Quantities for payment shall be <br />determined by field measurement of subcuts. This item is not granular bedding <br />included in bid price per linear feet of pipe. <br /> <br />H. Pipe Foundation Rock - Payment shall be at the contract unit price per ton of <br />foundation rock furnished and installed. Weigh tickets shall be provided at the <br />end of each day. <br /> <br />I. Reinforced Concrete Apron WI Trashguard - Payment shall be at the contract <br />unit price for each size of apron. <br /> <br />J. 4" Perforated Drain Tile System (complete) - Payment shall be at the contract <br />unit price per linear foot of drain tile measured in place. <br /> <br />K. Rip Rap WI Geotextile Fabric - Payment shall be at the contract unit price per ton <br />of rip rap installed wI geotextile fabric. Measurement shall be weigh tickets <br />provided to and approved by the Engineer for the rip rap installed. <br /> <br />L. Watermain Pipe - Watennain pipe shall be paid for at the contract unit price per <br />lineal foot. Measurement shall be in-place lineal feet of pipe with no deduction <br />for fittings. <br /> <br />M. Hydrant & Valve - Payment shall be at the contract unit price for each hydrant <br />and valve complete. Measurement shall be each hydrant and valve in place. <br /> <br />N. Valve & Box - Payment shall be at the contract unit price for each valve and box <br />complete. Measurement shall be each valve and box in place. <br /> <br />O. Fittings - Payment shall be at the contract unit price per pound ofwatermain pipe <br />fittings. Measurement shall be the total weight in pounds of fittings installed. <br /> <br />P. Corporation Stops - Payment shall be at the contract unit price for each <br />corporation stop. Measurement shall be each corporation stop in place. <br /> <br />-7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.