Laserfiche WebLink
<br />TSCHIDA OW ASSO HILLS PLAT 4 <br /> <br />F. Connect to Existing Sewer - Payment shall be at the contract unit price for each <br />connection to the existing sewer. <br /> <br />G. Granular Foundation Material - Payment shall be at the contract unit price per <br />cubic yard of material furnished and installed. Quantities for payment shall be <br />determined by field measurement of subcuts. This item is not granular bedding <br />included in bid price per linear feet of pipe. <br /> <br />H. Pipe Foundation Rock - Payment shall be at the contract unit price per ton of <br />foundation rock furnished and installed. Weigh tickets shall be provided at the <br />end of each day. <br /> <br />I. Reinforced Concrete Apron WI Trashguard - Payment shall be at the contract <br />unit price for each size of apron. <br /> <br />J. 4" Perforated Drain Tile System (complete) - Payment shall be at the contract <br />unit price per linear foot of drain tile measured in place. <br /> <br />K. Rip Rap WI Geotextile Fabric - Payment shall be at the contract unit price per ton <br />of rip rap installed wI geotextile fabric. Measurement shall be weigh tickets <br />provided to and approved by the Engineer for the rip rap installed. <br /> <br />L. Watermain Pipe - Watennain pipe shall be paid for at the contract unit price per <br />lineal foot. Measurement shall be in-place lineal feet of pipe with no deduction <br />for fittings. <br /> <br />M. Hydrant & Valve - Payment shall be at the contract unit price for each hydrant <br />and valve complete. Measurement shall be each hydrant and valve in place. <br /> <br />N. Valve & Box - Payment shall be at the contract unit price for each valve and box <br />complete. Measurement shall be each valve and box in place. <br /> <br />O. Fittings - Payment shall be at the contract unit price per pound ofwatermain pipe <br />fittings. Measurement shall be the total weight in pounds of fittings installed. <br /> <br />P. Corporation Stops - Payment shall be at the contract unit price for each <br />corporation stop. Measurement shall be each corporation stop in place. <br /> <br />-7- <br />