Laserfiche WebLink
<br />305.301 VALVES AND BOXES <br /> <br />Valves and boxes including extension will be considered as a unit and will be paid for at <br />the contract unit price per valve and box installed. <br /> <br />305.302 GATE VALVES <br /> <br />Gate valves will be paid for at the contract unit price per valve installed in the manhole. <br /> <br />305.303 VALVE MANHOLES . <br /> <br />The manhole will be paid for under a separate item and paid for at the unit price per <br />valve manhole constructed. <br /> <br />305.304 AIR RELIEF VALVE AND MANHOLE <br /> <br />Air'reliefvalve and manhole shall be measured as a unit including complete manhole, <br />granular fill, corporation stop, gate valve and accessories. <br /> <br />305.305 CURB STOP AND BOX <br /> <br />,.J <br />:::1 <br /> <br />Curb stop and box including box extensions will be considered as a unit and will be paid <br />for at the contract unit price per curb stop and box furnished and installed. <br /> <br />J <br />j <br /> <br />305.306 CORPORATION STOP <br /> <br />Corporation stops will be paid for at the contract unit price per corporation stop <br />furnished .and installed. <br /> <br />: <br />j <br /> <br />305.400 CONNECTING TO W ATERMAIN <br /> <br />305.401 CUTTING INTO AND CONNECTING TO EXISTING W A TERMAINS <br /> <br />I <br />J <br /> <br />! <br />1 <br /> <br />Except for the installation of the tapping sleeve and valve under pressure cutting in and <br />connecting to existing mains shall be incidental tO'the construction of the watennain <br />exclusive of fittings used. Fittings used shall be measured and paid as fittings. <br /> <br />305.402 INSTALLATION OF TAPPING SLEEVE AND VALVE UNDER PRESSURE <br /> <br />j <br />j <br />J <br />~ <br />J <br /> <br />The installation of the tapping sleeve and valve under pressure shall be measured and <br />paid as a unit. a!ld shall include all labor, tapping sleeve, valve, manhole and <br />miscellaneous materials and equipment necessary to make the installation. This will be <br />defined as a Special Structure on the proposal fonn and plans. <br /> <br />305.500 HYDRANTS <br /> <br />300-19 <br />