My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02823
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2800
>
pf_02823
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:13:48 PM
Creation date
12/8/2004 1:20:07 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2823
Planning Files - Type
Division of Land
Address
350 OWASSO BLVD S
Applicant
TSCHIDA, FRANK
Status
APPROVED
PIN
012923130090
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />LAW OFFICES OF <br />PETERSON, BELL, CONVERSE & JENSEN, P .A. <br /> <br />K~,- <br />----- <br /> <br />Erwin A. Peterson <br />Roben C. Bell <br />Willard L. Converse <br />Roger A. Jensen <br />James C. Erickson*t <br />Carol A. Baldwin <br />Caroline Bell Beckman <br />Mitchell W. Converse <br />Shari A. Jacobus <br /> <br />1500 Minnesota World Trade Center <br />30 East Seventh Street . <br />St. Paul, MN 55101 <br /> <br />Telephone (612) 223-4999 <br />Facsimile (612) 223-4987 <br /> <br />Of Counsel <br />Kurt F. Walther <br />Charles R. Bartholdi <br /> <br />August 18, 1997 <br /> <br />VIA CERTD1KD MAll.. <br /> <br />Mr. Frank Tschida <br />350 South Owasso Boulevard <br />Roseville, MN 55113 <br /> <br />RE: Development Contract (Tschida Owasso Hills Fourth Addition) dated <br />June 25, 1996 <br />Our File No: 1011.19 <br /> <br />Dear Mr. Tschida: <br /> <br />Please be advised that this office represents the City of Roseville. <br /> <br />In that capacity, you are hereby furnished notice of the following defaults on the above- <br />named contract: <br /> <br />1. Repair the intersection of Farrington and Stanbridge Circle. <br /> <br />2. Final grade, place top soil, and sod along the north and south sides of Stanbridge <br />Circle from Farrington Street to the start of the circle and from the back of curb <br />to the right-of-way lines. <br /> <br />3. A fmal inspection of the concrete curb and gutter needs to be done. The Public <br />Works will determine if any needs to be removed and replaced. <br /> <br />4. Remove bad sections of the bituminous street, test roll the base, replace base if <br />needed, replace bituminous base course, and lay wear course to complete the <br />street. <br /> <br />5. Remove silt and resod if needed from the rear yard of 2gJ3 Farrington Street. <br /> <br />.AIso AdmiaM in Wisconsin <br />tCivil Trial Specialist. Cettified by !be Civil Litigation Section of the M'mnesola SlIfe Bar Association. <br />
The URL can be used to link to this page
Your browser does not support the video tag.