My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02823
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2800
>
pf_02823
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:13:48 PM
Creation date
12/8/2004 1:20:07 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2823
Planning Files - Type
Division of Land
Address
350 OWASSO BLVD S
Applicant
TSCHIDA, FRANK
Status
APPROVED
PIN
012923130090
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />---------------- <br /> <br /> <br /> <br />Fax' <br /> <br />August 14, 1997 <br /> <br />Fax' <br /> <br />To: Marty Hanson Community DevelopmeL <br />From: D~~ Strong Engineering Department --a <br />e~asso Hills 4 Plat repair list <br />The following is a list of items that need to be completed for the above named plat: <br /> <br />1. Repair the intersection of Farrington and Stanbridge Circle. <br /> <br />2. Final grade, place top soil, and sod along the north and south sides of Stanbridge Circle from <br />Farrington Street to the start of the circle and from the back of curb to the right-of-way lines. <br /> <br />3. A final inspection of the concrete curb and gutter needs to be done. The Public Works will <br />determine if any needs to be removed and replaced. <br /> <br />4. Remove bad sections of the bituminous street, test roll the base, replace base if needed, <br />replace bituminous base course, and lay wear course to complete the street. <br /> <br />5. Remove silt and resod if needed from the rear yard of2973 Farrington Street <br /> <br />6. Complete final grading along the east side of the plat and sod ditch to reduce erosion. <br />This ditch must flow north to South Owasso Boulevard. At this time it doesn't. <br /> <br />7. Final grading of pond needs to be completed. Removal of silt in the pond needs to be <br />completed and the removal of silt within the storm sewer pipes. The catch basin at the <br />northwest corner of the pond has sand and silt in it. This needs to be removed. <br /> <br />8. Inspection of the storm sewer lines in Farrington Street must be done and any sand or silt <br />within the pipes or catch basins removed. <br /> <br />9. There is an electrical wire that would serve 340 Stanbridge Circle that is exposed. The <br />covering over the wires has been removed and needs to be replaced. <br /> <br />10. The Sanitary Sewer, Storm Sewer, and Water mains need to have a final inspection done on <br />them by the contractor and the City ofRoseville's Utility Department. <br /> <br />, . <br /> <br />11. The new hydrant in the circle is not 18" above grade as per code. <br /> <br />12. There are no street lights placed. Two lights are required, one at Farrington Street and <br />one at the end of the cul-de-sac. <br /> <br />13. Turf establishment on those lots not built on must be completed. <br /> <br />CEJ <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.