Laserfiche WebLink
<br /> <br /> TABLE OF CONTENTS <br />7 GENERAL CONDITIONS OF CONTRACT <br />it <br />. <br /> PAGE <br /> 1. DEFINITIONS GC - 1 <br /> 2. CONTRACT DOCUMENTS GC - 3 <br />j 2.1 EXECUTION, CORRELATION & INTENT OF DOCUMENTS GC - 3 <br /> 2.2 BID PROPOSAL GC - 3 <br />" <br />i <br />II 3. PROGRESS AND SUBMISSION SCHEDULES: NOTIFICATION TO <br />! BEGIN WORK GC - 3 <br />'J 3.1 CONTRACTORS SCHEDULE GC - 3 <br /> 3.2 NOTIFICATION OF INTENT TO BEGIN WORK GC - 4 <br />I <br />'~ 3.3 PRECONSTRUCTION CONFERENCE GC - 4 <br />4. BONDS AND INSURANCE GC - 4 <br /> 4.1 BID BOND GC - 4 <br />.,J 4.2 PERFORMANCE BOND GC - 4 <br />~ <br />'~ 4.3 CONTRACTORS INSURANCE GC - 4 <br />J 5. DRAWINGS AND SPECIFICATIONS GC - 6 <br />f 5.1 DESIGN, DRAWINGS AND INSTRUCTIONS GC - 6 <br /> 5.2 COPIES OF DRAWINGS FURNISHED GC - 6 <br />..J 5.3 OWNERSHIP OF DRAWINGS GC - 6 <br />6. SURVEYS AND CONSTRUCTIOH STAKES ,GC - 7 <br />OJ 7. CONTRACTORS RESPONSIBILITIES GC - 7 <br /> 7.1 CONTRACTORS SUPERVISION & SUPERINTENDENCE GC - 7 <br />] 7.2 MATERIALS, EQUIPKEHT AND LABOR GC - 7 <br /> 7.3 SUBCONTRACTORS GC - 7 <br />1 7.4 USE OF COMPLETED PORTIONS GC - 8 <br /> 7.5 CONTRACTORS RESPONSIBILITY FOR WORK GC - 8 <br />] 8. PROTECTION OF THE PUBLIC AND OF WORK AND PROPERTY GC - 8 <br />9. CONTROL OF WORK AND MATERIAL GC - 9 <br />J 9.1 SEPARATE CONTRACTS GC - 9 <br /> 9.2 USE OF PREKISES GC - 9 <br />] 9.3 ACCESS TO WORK; UNCOVER FINISHED WORK GC - 9 <br />j <br /> <br /> <br />