Laserfiche WebLink
<br />Air Emission Permit No. 12300387-9 <br />Page 7 of 22 <br /> <br />PART 5. SUBMITTALINOTIFICATIONS SUMMARY <br /> <br />This Part is a summary of the written submittals and notification to be submitted to the MPCA. <br />All submittals must be postmarked or received by the date specified below, unless stated <br />otherwise. If applicable, extension requests for submittal dates must be postmarked or received <br />at least 21 days prior to the deadline specified below. <br /> <br /> Submittall Required <br /> Notification by <br />1. Performance A. Pre-test meeting To be held at least seven <br />T estlRetest request working days prior to test date <br />Submittals B. Test plan At least 30 days before the test <br /> date <br /> C. Notification of Test:. At least 30 days prior to Minn. R. <br /> performance test test date; and <br />(retest must be done D. Retest notification Retest: At least 21 days in 7017.2001 <br />within 30 days of following receipt of advance of the retest date to <br />receipt of the notice failure to demonstrate 7017.2060 <br />of non-compliance) compliance letter only and <br /> E. Performance test Within 45 days of test for Part 6.2. <br /> and retest reports written report and within 105 <br /> submittal days of test for microfiche <br /> report (both are required) <br />2. Construction! A. Notification of Within 15 days after such date Part 6.4 <br />Startup Submittals initial startup <br />3. Monitpring Semiannual monitoring By January 30th for the 6 Part 6.3, <br />Report report month period from July 1 st Part 11 <br /> through December 31 st and <br /> by July 30th for the 6 month <br /> period from January 1st <br /> through June 30th. <br />4. Other Submittals A. Emission inventory Annually, by April of the Part 7.9. <br /> following year <br /> B. Installation of air At least 7 days prior to starting Part 7.7. <br /> pollution control construction <br /> equipment or <br /> replacement of an <br /> emission unit <br />5. Compliance Annual certification By January 30th for covering Part 7.4. <br />Certification the preceding year Part 10. <br />6. Changes Which Written notification 7 working days prior to Part 7.7. <br />Contravene Certain making actual changes <br />Permit Terms <br />