Laserfiche WebLink
<br />incorporated in the PUD. <br /> <br />5,3 The minimum lot size (60,000 s.f. or 1.4 acres) and building setbacks (8-4 <br />allows for 30 feet of front setback, 10 feet of side setback, and 20 feet of rear setback), <br />These standards will be established in the PUD. <br /> <br />5.35 Building materials must be a combination of brick, architectural steel, and glass <br />on a minimum of 65% of all vertical exterior wall surfaces visible from any public right of <br />way, The brick must be of earth tone browns and dark browns. No more than 35% of <br />any vertical exterior wall may be a combination of color impregnated rock face block <br />stucco, or EFIS/Dryvit, primarily for base, trim, or accent and sign banding. Vertical <br />walls in loading bay areas (or portions thereof) that are not visible from any public right- <br />of-way may use matching color impregnated masonry materials such as block, poured <br />or tip up panel concrete, See Exhibit D. <br /> <br />5,36 All HVAC must be roof mounted and screened from view as measured/viewed <br />from any adjoining right-of-way line. <br /> <br />5.37 Loading dock areas will be screened from view from any public right-of-way by <br />building design or with 80% opaque year-round screening, masonry wing walls, and <br />berming to a minimum height of 10 feet (or the sign band height, whichever is higher) <br />above adjacent curb heights. Loading area entrances will be no wider than 28 feet, with <br />appropriate curb radius for truck turning. <br /> <br />5.38 Street parking requirements will be established by the City. No semi tractor or <br />trailer parking on streets, landscaped areas or parking lots, or loading areas, except <br />while delivering materials, will be allowed in the business park. No RV parking will be <br />allowed, <br /> <br />5.4 A semaphore/stoplight may be necessary in the future for entry/exit safety into <br />the business park, At such time as the semaphore is determined to be necessary by the <br />County Engineer and the City, the semaphore shall be installed and assessed to all of <br />the parcels in the business park, The location of the semaphore will not be known until <br />the major users are in place within the park - estimated to be 3 years after approval of <br />the PUD, <br /> <br />5.41 Parking setbacks of 15 feet from the front property line will require 80% opaque <br />year-round screening and berming to a minimum height of 30" above curb height <br />similar to the Industrial Districts. <br /> <br />5.42 Planting areas with shade trees must cover a minimum of 5% of the parking lots, <br />All landscaped areas, including planting islands will be irrigated to protect the turf and <br />trees/landscaping materials. <br /> <br />5.43 Sidewalks will be required along all interior streets. Connections will be required <br />between the sidewalks and the pathway. The exterior 8 foot pathway (along the north, <br />west, and south side of the business park will be dedicated for public use through an <br /> <br />4 <br /> <br />- ---.----.-- <br /> <br />-.-.-"-- <br />