My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02882
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2800
>
pf_02882
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:19:54 PM
Creation date
12/8/2004 1:24:50 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2882
Planning Files - Type
Conditional Use Permit
Address
2233 HAMLINE AVE N
Applicant
SPINT PCS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />fencing (up to 8 feet high and topped with barbed wire) by landscape plantings will be <br />required to reduce at grade visibility of the equipment. <br /> <br />3.6) A prefabricated set of equipment panels will be needed near the base of the <br />tower. They will be connected to the tower by one cable to each antenna. <br /> <br />3.7) The towers are not required to be lighted. Electric and phone wires to the site will <br />be buried. Security lighting on the site must be downcast on the equipment areas only. <br /> <br />3.8) It is possible that the city may place additional emergency services whip antenna <br />for fire, police, and public works on the same tower. Over the long term, the city may <br />wish to own the tower. <br /> <br />4.0 Staff Summary and Recommendation: <br /> <br />4.1) The staff has reviewed the information in the application and finds it to be <br />consistent with the intent of public/semi public uses on city owned or controlled sites. <br />No safety hazard has been identified. The use will be screened from view by mature <br />trees and topography. The use could reduce the need for other such towers by allowing <br />for up to nine antenna on one tower. The tower can also enhance public emergency <br />communications systems. Equipment areas at grade will be screened with plantings <br />and wires into the site will be buried. Building permits, including engineering <br />calculations for structural stability will be required. <br /> <br />4.2) Staff recommends approval of the conditional use permit to allow for the <br />construction of one permanent cellular telephone tower on property commonly known <br />as the Water Authority site. <br /> <br />4.3) As part of the City Council conditional use permit resolution, the staff <br />recommends that a series of operational conditions be included in the permit. (See <br />attachment "A".) <br /> <br />Suggested Commission Action: <br /> <br />1) Open the public hearing. Accept comment. If satisfied all comment has been <br />heard, close the hearing. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.