My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02883
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2800
>
pf_02883
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:19:58 PM
Creation date
12/8/2004 1:24:57 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2883
Planning Files - Type
Conditional Use Permit
Address
2561 SNELLING AVE N
Applicant
NATIONAL TIRE/EMBREE CONST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />REQUEST FOR PLANNING COMMISSION ACTION <br />DATE: 04/09/97 <br />CASE NO: PF2883 <br />Department Approval: Manager Approved: Agenda Section: <br />v/W Hearing 6e <br />Item Description: Embree Construction request for conditional use permit approval to <br />construct an 11,000 sJ. auto accessory/tire/service facility at 2561 <br />Snelling Ave. (Continued at applicants request from March 12, <br />1997 meeting). <br /> <br />UJ. BACKGROUND <br /> <br />1.1 Embree Construction applied for a conditional use permit and a variance to <br />construct an auto accessory/tire/service facility at 2561 North Snelling. The <br />commission continued the case from March 12 to April 9 because the applicant could <br />not demonstrate either ownership or control of the site from the Knights of Columbus. <br /> <br />1.2 No further information of ownership or control of the site is available at this <br />time (04/02/97). <br /> <br />Ul STAFF RECOMMENDATION <br /> <br />2.1 Staff recommends denial of the request without prejudice because it is <br />incomplete. The applicant has either lost control of the site or was never provided such <br />control. The applicant should be allowed reapply without delay if such site control is <br />obtained in the next 180 days. The applicant would be required to pay a new <br />application fee. <br /> <br />~ SUGGESTEDACnON <br /> <br />3.1 By motion, recommend denial of the conditional use permit and variance request <br />by Embree Construction because the application is incomplete: the applicant does not <br />have control of the site. Further, recommend that the applicant be able to reapply <br />without delay if site control is gained in the 180 days. A new application fee will be <br />required. <br /> <br />Report by: Dennis Welsch, 490-2232 <br />M:\RPCA\PF2883.DOC <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.