My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02883
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2800
>
pf_02883
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:19:58 PM
Creation date
12/8/2004 1:24:57 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2883
Planning Files - Type
Conditional Use Permit
Address
2561 SNELLING AVE N
Applicant
NATIONAL TIRE/EMBREE CONST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />;J-ff :> <br /> <br />REQUESTFORCOUNC~AcnON <br />DATE: 04/14/97 <br />ITEM NO: I-I <br />Agenda Section: <br />LAND USE <br />Embree Construction request for conditional use permit approval to <br />construct an 11,000 s.f. auto accessory/tire/service facility at 2561 <br />Snelling Ave. (Continued at applicants request from March 12, <br />1997 meeting). <br /> <br /> <br /> <br />1.0 BACKGROUND <br /> <br />1.1 Embree Construction applied for a conditional use permit and a variance to <br />construct an auto accessory/tire/service facility at 2561 North Snelling. The Planning <br />Commission continued the case from March 12 to April 9 because the applicant could <br />not demonstrate either ownership or control of the site from the Knights of Columbus. <br /> <br />1.2 No further information of ownership or control of the site was available at the <br />time this agenda packet was prepared. <br /> <br />2.0 STAFF RECOMMENDATION <br /> <br />Staff recommends denial of the request without prejudice because it is incomplete. The <br />applicant has not demonstrated control of the site. The applicant should be allowed to <br />reapply without delay if such site control is obtained in the next 180 days. The <br />applicant would be required to pay a new application fee. <br /> <br />. 3.0 PLANNING COMMISSION RECOMMENDA TION <br /> <br />On April 9, 1997, the Planning Commission concurred with the staff and recommended <br />that the request be denied without prejudice because it was found to be incomplete. <br />The applicant should be allowed to reapply without delay if such site control is obtained <br />in the next 180 days. The applicant would be required to pay a new application fee. <br /> <br />4JJ. SUGGESTED COUNCIL ACTION <br /> <br />By motion, deny the current conditional use permit and variance request by Embree <br />Construction to construct an 11,000 sJ. auto accessory/tire/service facility at <br />2561 Snelling Ave. because the application is incomplete: the applicant has not <br />demonstrated control of the site. Further, recommend that the applicant be able to <br />reapply without delay if site control is gained in the 180 days. A new application fee will <br />be required. <br /> <br />Report by: Dennis Welsch, 490-2232 <br />M:\RCA\PF2883.RCA <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.