My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02883
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2800
>
pf_02883
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:19:58 PM
Creation date
12/8/2004 1:24:57 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2883
Planning Files - Type
Conditional Use Permit
Address
2561 SNELLING AVE N
Applicant
NATIONAL TIRE/EMBREE CONST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />,.. <br /> <br />Mr. Jay Kennedy <br />March 25, 1997 <br />Page No.2 <br /> <br />The motorists traveling from the north on Snelling Avenue will still have the opportunity to make <br />a right turn onto Oakcrest Avenue and into the site. However, upon exiting, they will not be able <br />to make the left turn to go northbound on Snelling A venue. Two options are again available to these <br />motorists. They may turn right onto Snelling Avenue, travel south, exit and reenter northbound <br />Snelling Avenue at either the County Road B2 or the Highway 36 interchanges, or may make a U <br />turn at County Road B. The other option is to travel west on Oakcrest Avenue and make right turns <br />on Fairview Avenue and County Road C to travel back to Snelling Avenue. The alternate route is <br />not attractive, but is easier to follow than finding an alternate inbound route. We therefore anticipate <br />approximately 50 percent of the traffic will use the alternate route and 50 percent elect to use exits <br />and reentering to reach northbound Snelling Avenue. We therefore anticipate approximately <br />93 vehicles per day traveling westbound on Oakcrest Avenue. Thus, the total additional traffic <br />volume on Oakcrest Avenue from the National Tire Warehouse is estimated at 144 vehicles per day. <br /> <br />If you have any questions, or need any additional information regarding our calculations, <br />assumptions and estimates, please feel free to call me. <br /> <br />Sincerely, <br />Short Elliot Hendrickson Inc. <br /> <br />~~J~ <br /> <br />Glen Van Wormer, P.E. <br />Manager, Transportation Department <br /> <br />sah <br />F:\PR01ECTSlROSEV\9402\LETIERS\KENNEDY.M2S <br />
The URL can be used to link to this page
Your browser does not support the video tag.