Laserfiche WebLink
<br />EXHIBIT A <br /> <br />Larry Alm-Southwind of Roseville <br />4/28/97 <br /> <br />Sale of Land <br /> <br />Additional Developer Costs <br /> <br />$141,113 <br /> <br />- $22.000 Road Construction (1) <br />- 11,000 Soil Compaction correction (2) <br />6,000 Utility line removal or fill in (3) <br /> <br />- $39,000 Additional Costs <br /> <br />- 39,000 <br /> <br />$102,113 <br />say $102,000 <br /> <br />(1) Road construction includes approximately 250 feet of new curb, gutter, grading, <br />pavement and utility construction from existing cul-de-sac east. While the developer will <br />vacate a portion of the existing cul-de-sac to create more efficient land use, the <br />developer will also incur the expense of removal of a portion of the existing cul-de-sac <br />and curb line. <br /> <br />(2) There is soil correction and compaction on the new road extension made <br />necessary by previous filling along the edge of the site. <br /> <br />(3) There is one city utility line which must be abandoned and removed from Zeece's <br />Plat Lot 4, Block 1 in order to provide use of the buildable portion of the lot. <br /> <br />3 <br />