My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02885
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2800
>
pf_02885
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:20:30 PM
Creation date
12/8/2004 1:25:05 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2885
Planning Files - Type
Planned Unit Development
Address
2660 CIVIC CENTER DR
Applicant
SOUTHWIND OF ROSEVILLE
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Community Development Department <br />651.490.2279. fax: 651.490.2931 <br /> <br />~ Remove dead sod from the area adjacent to the retaining wall south of County Road B. <br />Replace this area with topsoil consistent wit1 MnDOT standards and new sod. <br /> <br />~ Confirm when completion of utility line installation will occur on the ground adjacent to <br />2098, 2100, and 2110 Albemarle Court. Re-grade swale adjacent to 2100 Albemarle <br />Court to provide positive drainage. Scrape offrocks and stones on adjacent (northwest) <br />berm and add topsoil in accordance to MnDOT standards to swale area and on the berm. <br />Seed area with the same natural seed mixture as used throughout the development. <br /> <br />~ Verify property line along the southern portion of the site, east of retention pond. Scrape <br />off small rocks and stones from swale and adjacent (south) property. Add topsoil to <br />swale and adjacent property, sod three rows wide, and seed remaining area, to provide <br />this bare ground area with established turf. <br /> <br />~ Remove all debris from all natural areas including large rocks, chunks of concrete, metal <br />re-bar, and/or other unsightly material. <br /> <br />~ Clean out both the inlet and outlet pipe flowing to and from the retention pond and install <br />trash guards on both apron pipes. Provide additional riprap rock at the bottom of the inlet <br />pIpe. <br /> <br />The Homeowner Association Shall: <br /> <br />~ Implement a maintenance plan to address all natural areas. This plan should be premised <br />upon either leaving these areas in a "no mow" condition or cutting to provide aesthetic <br />appeal. <br /> <br />~ Check all irrigation heads and determine whether adjustments are necessary to ensure <br />watering of perimeter trees and natural areas. <br /> <br />~ Establish ground cover on all small bare areas using topsoil and seed. <br /> <br />~ Consider the installation of larger mulch areas in locations that have groupings of trees. <br />These areas include the stand of trees west of the retaining wall adjacent to County Road <br />B; the area planted with coniferous trees in the rear yard area of2125 and 2127 <br />Albemarle Court; and other areas identified by the Homeowner Association. <br /> <br />~ The Homeowners Association shall take full responsibility for maintaining the site <br />landscaping upon completion by Mr. Aim. <br />
The URL can be used to link to this page
Your browser does not support the video tag.