Laserfiche WebLink
<br />10.1 General Development Standards. The preliminary and final plat of Roseville <br />Commons, site development plan (including building and improvement setbacks), <br />grading plan, utility servicing plan, landscape plan, building elevations, building floor <br />plans, association covenants, project narrative, and City Street Tree Master Plan <br />(identified as Exhibits A - K in Section 4.0 of this document), and final land use <br />designations shall be part of the standards for development of the Roseville <br />Commons PUD. <br /> <br />10.2 Uses. The use of property within the PUD shall be limited to a three-story 30 unit <br />condominium building with an underground parking garage, and shall be restricted <br />to the parameters specified in the site development plan, building elevations, and <br />supporting documents submitted by the DEVELOPER. Where not superseded by <br />more restrictive requirements of this PUD, the standards of the underlying R-3A <br />(medium density residential) zoning district shall apply, as stated in Chapter 1004 <br />of the Roseville City Code. <br /> <br />10.3 Restrictive Covenants. Restrictive covenants for ownership and use of this site are <br />attached hereto as Exhibit I. The DEVELOPER has indicated that residency will be <br />restricted to persons 55 years of age and older; therefore, the age limitation shall <br />be included herein as a provision of approval. Any future changes to the restrictive <br />covenants, including but not limited to the age of residency, shall be submitted to <br />the CITY for review and approval; however, the CITY shall not be a party to the <br />restrictive covenants. <br /> <br />10.4 Building Setbacks. Building setbacks shall be as shown on the approved site <br />development plan. Section 1016.16 of the City Code requires a structure setback <br />of 50 feet from the wetland boundary and a parking area setback of 30 feet from the <br />wetland boundary. As proposed, the west end of the off-street parking area and the <br />southwest corner of the building will be set back less than ten feet from the wetland <br />boundary. The limited buildable area, combined with the required setbacks from <br />both County Road C2 and Highway 88, creates a practical difficulty for the applicant <br />and presents justification for granting variances to the storm pond and wetland <br />setback requirements. A variance to reduce the setback of the off-street parking <br />area and building to 10 feet from the wetland boundary, as shown on the site <br />development plan, is hereby granted. In order to mitigate the impacts of <br />encroaching into the setback area, stormwater run-off will need to be pre-treated <br />prior to being discharged into the wetland and native vegetation will be required in <br />the areas being filled. <br /> <br />PUD/Subdivision Agreement # _ (Mendota Homes, Inc.) - Page 6 of 10 <br />