Laserfiche WebLink
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: August 26, 2014 Item No: 4 <br />Item Description: Communication Items <br />Projects update: <br />• 2014 PMP- This project is well underway. Paving will be occurring in the northwest area <br />of the City the week of August 25"'. The final areas are waiting for the new storm sewer <br />and drainage improvements to be complete. The City is installing some substantial storm <br />water retention and treatment devices in the northwest corner of the City (Stanbridge St <br />and Manson St, which is now complete) and at Dellwood St and Sherren St behind the <br />Roseville library to address some historic drainage issues. Work on the Dellwood and <br />Sherren system has begun and should be complete within the next two to three weeks. <br />• County Road B2 Sidewalk Construction — This project consists of constructing a 6 foot <br />sidewalk along the north side of County Road B2 from Lexington Ave to Rice Street as <br />well as along Victoria Street from County Road B2 north to County Road C. Concrete <br />curb and sidewalk has been installed from Lexington to Dale, and in front of Central Park <br />Elementary School. The contractor is working on restoration through this area, and will <br />be completed with this area before school starts. Weather permitting, the sidewalk east of <br />Central Park to Rice Street will be completed by the end of September. <br />• 2014 Sanitary Sewer Lining Project—This project is about 90 % complete. Work remains <br />on one segment of County Road B-2, Larpenteur Avenue, and an easement through <br />Central Park. The contractor plans to complete the remaining segments after the ground <br />has frozen. The easement work is scheduled for winter work (or frozen ground), to <br />minimize turf damage through Central Park <br />• Snelling Ave Bus Rapid Transit: Final plans for this project are under development. All <br />of the stations will be under construction in 2015 with the BRT service stating in late <br />2015. Metro Transit will be starting a public outreach effort involving Public Art for the <br />new stations. Currently we are in the early stages of the Public Art discussion. It should <br />be noted that given the scale of this project and the budget it may be likely that not every <br />station will get a public art element. Staff will continue to update the Commission on this <br />item. <br />I -35W Interchange Project: The City received three proposals for engineering services for <br />the design and construction administration of the intersection at the 35W north ramps and <br />Cleveland Ave. Based on staff scoring of the proposals, the City Council awarded a <br />contract to SRF Consulting Group. This project is expected to be under construction in <br />2015. We will update the commission with a revised layout of this project likely in <br />October. <br />County Road B Pathway: At its August 11th meeting, the City Council voted to restrict <br />parking between Fairways Lane and Fulham Street based on input from the residents in <br />that area via a mailed survey. The alternative to restricting parking would have been to <br />