pave a wider strip in this area to support both parking and the pathway. The decision by <br />Council results in widening the shoulder area here by about 2 feet to support the pathway <br />only. The pathway is under construction. Work has been focused on the area east of <br />Fulham to date, but crews are now prepping the area west of Fulham. Paving is expected <br />within the next two weeks but is dependent on contractor availability. <br />• Victoria Street Reconstruction and Sidewalk Project: Staff is starting preliminary work <br />on next year's reconstruct project along Victoria Street south of County Road B. This <br />project will involve complete reconstruction of the roadway, curb and gutter installation <br />at various points, storm water improvements, as well as a new sidewalk. The sidewalk <br />will extend north and tie into the new sidewalk at County Road B2. The City is working <br />with the County and their expected mill and overlay project on Victoria north of County <br />Road B to possibly narrow the roadway to make room for the sidewalk on the east side of <br />the roadway. More information on this project will be available in the coming months. <br />• The City's water tower is currently being painted, both inside and out. Because of this, <br />the water tower is empty and the City's water distribution system is tied into the Arden <br />Hills system. The work is expected to be complete in about three weeks at which time the <br />water tower will be put back in service. <br />Maintenance Activity: <br />• Staff is starting a City wide sweeping of the streets. This will take about two weeks. <br />• Staff has been spending a significant amount of time monitoring and cleaning drainage <br />infrastructure due to the number of rainfall events. <br />• Street maintenance staff is spending a significant amount of time mowing boulevards and <br />maintaining streetscape areas. <br />• Seasonal street maintenance activities continue with general patching operations as well <br />as crack sealing. <br />• Street crews are preparing the County Road B shoulder widening for a pedestrian facility. <br />• Street maintenance crews are preparing a segment of the Langton Lake Pathway for <br />resurfacing. <br />• Utility crews continue with preventive maintenance activities including hydrant and gate <br />valve repairs, meter installations, and sewer jetting (cleaning) operations. <br />Other: <br />TIF (tax increment financing) information. The Commission had asked for additional <br />information on the workings TIF funding. Attached are a couple of documents that explain TIF <br />funding for cities. <br />Attachments: <br />A: 2014 Project Map <br />B: 2014 Sewer Lining Map <br />C: TIF Funding information <br />