Laserfiche WebLink
<br /> <br /> <br />\or ~~ <br /> <br />~\\-J o~ <br /> <br />~~~~ ~ <br /> <br />Construction Is anticipated to start by at. .JIII 1995 with an estimated occupancy date <br />of Spring 1997. this building Is of superior design quality and Is anticipated to fill a <br />strong need In Rosevllle for affordable Senior H9uslng In an excellent location for <br />Seniors. <br /> <br />. _ ~. c..\..p ~f-\''''\ ) \ut-s"',",-- C9\.,f <br /> <br />. ,W\ ~~~ \~~ ~~ ~ <br />Phase1!1ot this development proposal would Include e& units of ~ tOWJ1llUllles. <br />These town~rnes would b. 1 aid 2 storkP, and will provide an appropriate transition <br />between the ~story senior buildings to tile south and the 1- to 2-story single family <br />homes to the north. <br /> <br />The z~es would hav~ attached garages and Individual entryways. The townhomes <br />would contain a 50% mix of 2- and 3-bedroom units, wt)lch may be modified based on <br />further market analysis. The-.buildlngs would have a low maintenance ~Inyl exterior. <br /> <br />I. <br /> <br />. <br /> <br />. <br /> <br /> <br />. <br /> <br />. <br /> <br /> <br />Each unit would contain a separate furnace and washer/dryer hook-up. Kitchens would <br />contain a full appliance package Including dishwasher, disposal, range, frost free <br /> <br />oJ _ <br /> <br />L. <br /> <br />- <br /> <br />0: <br />