My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02985
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2900
>
pf_02985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:27:34 PM
Creation date
12/8/2004 1:56:54 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2985
Planning Files - Type
Interim Use Permit
Address
515 LARPENTEUR AVE W
Applicant
RAMSEY COUNTY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />8. Neither concrete crushing nor concrete batch mixing activities shall be undertaken <br />at the same time as tree and stump grinding activities on the site, nor at times when <br />household hazardous waster collection activities are being conducted. <br /> <br />9. No work may begin on the site until interim use permit #3 is issued by the <br />Community Development Director. Interim use permit #3 shall be reviewed annually <br />in October, with the County being notified of the status of such review by January <br />1 of the following year. In conjunction with the review process, the County shall <br />provide the Community Development Director with sound level measurements and <br />dust counts from specific sites and during specific times as designated by the <br />Community Development Director. The County shall also provide the Community <br />Development Director with information on the volume of new, recycled, and fines <br />materials moved onto the site, off the site, and used in batch mix operations (in <br />cubic yards). <br /> <br />10. All activity allowed under this interim use permit #3 shall be completed by December <br />31, 2000. The interim use permit #3 may be revoked prior to this date for <br />noncompliance with the conditions. <br /> <br />11. The interim use permit shall be valid for the remainder of 1998, and must be <br />renewed in 1999 and 2000 for a period of one year. <br /> <br />12. The concrete fines must be hauled away from the site after each year's crushing <br />and mixing operation. <br /> <br />13. Ramsey County must define the interim uses on the property as well as the ultimate <br />use(s) of this property. The County shall submit a program and site plan identifying <br />the existing uses and approved interim uses and the ultimate use of the property to <br />the Community Development Director by October 1, 1998. <br /> <br />The motion for the adoption of the foregoing resolution was duly seconded by <br />Council Member Maschka and upon vote being taken thereon, the following voted in favor: <br />, and the following voted against the same: _' <br /> <br />WHEREUPON said resolution was declared duly passed and adopted. <br /> <br />Resolution _ - Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.