My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02985
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2900
>
pf_02985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:27:34 PM
Creation date
12/8/2004 1:56:54 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2985
Planning Files - Type
Interim Use Permit
Address
515 LARPENTEUR AVE W
Applicant
RAMSEY COUNTY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The attached matrix shows rhe pros and con of these options. The arcas of concern arc <br />cost, environmcntal imp:lct and use of materials. Brlscd on the cost srlvings rlnd the <br />benefit of reusing the existing aggregate, it is Rrlmsey County's desire to use the detention <br />pit for crushing existing concrete and hatching new concrete. <br /> <br />Ramsey County is willing to work with the City of Roseville to establish regulations <br />regarding the crushing operations. These regulations Crln be incorporated into the <br />specifications and SPCCi:l! provisions for Larpenteur Avenue construction projects. Some <br />examples of regulations which the County has considered to minimize the impacts or dust <br />and noise are: <br /> <br />I. All crushing operations in a given year would be completed by May I st. This wOllld <br />al]ow the crushing 10 be t!onc before the summer months and while school was still in <br />session. The only exception to this would he for the last phase of Larpenteur Avenuc <br />construction, in the year 2000, when a week of crushing would be required in the <br />summer. <br /> <br />2. Dust control measures would be implemented to minimize the dust produced by this <br />operation. Crushing the concrete in the early spring will allow the use of water to control <br />the dust. <br /> <br />3. I-lours of the day, days of the week and number of days for crushing arc all items which <br />C.1n be set prior to a contract heing awarded so Ihe contractor can he informed prior to a <br />given project. <br /> <br />Pleilse review the following infonnalion and let me know if you have any questions. We <br />look forward to working with the City of Roseville on this issue. Thanks for your <br />continued assistance in this project. <br /> <br />Sincerely, <br /> <br />y~ I. So-L <br /> <br />,,' <br /> <br />Daniel E. Soler, P.E. <br />Project Manager - Larpcntcur A venue <br /> <br />cc: Commissioner Jan \Viessner <br />
The URL can be used to link to this page
Your browser does not support the video tag.