My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03013
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3000
>
pf_03013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:29:51 PM
Creation date
12/8/2004 2:46:07 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3013
Planning Files - Type
Division of Land
Address
2660 CIVIC CENTER DR
Applicant
RYAN COMPANIES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />REQUESTFORCOUNC~AcnON <br /> <br />DATE: OS/26/98 <br />ITEM NO: B-3 <br />Agenda Section: <br />HEARING <br />Ryan Companies US, Inc. request for a minor subdivision at within <br />Centre Pointe Business Park Plat (PF#3013). <br /> <br /> <br /> <br />1.0 REQUESTEDACnON <br /> <br />1.1 Ryan Companies is requesting a minor subdivision to allow the subdivision and <br />recombination of portions of three lots (Lots 3, 4, 5, Block 1) into three parcels along <br />the west side of Centre Pointe Parkway. The purpose of this subdivision and <br />recombination is to reconfigure land areas to accommodate a two phase office <br />complex, in which the first phase will be built on portions of lot 3 and 4, and the <br />second will be built on portions of lots 4 and 5. The planning of the Centre Pointe <br />Business Park PUD anticipated the possible reconfiguration of lot lines to <br />accommodate new building designs. This reconfiguration has occurred previously <br />on the east side of the Business Park, along Cleveland Avenue. <br /> <br />1.2 This issue was continued from the April 27, 1998 meeting to allow the applicant an <br />opportunity to present the proposal on May 26, 1998. <br /> <br />2.0 BACKGROUND <br /> <br />2.1 Ryan Companies owns the three lots (Lots 3, 4, 5, Block 1) along the west side of <br />Center Pointe Drive, with an overall area of 11.99 acres. The northernmost lot - Lot <br />3 consists of 4.085 acres; Lot 4 has 3.07 acres; Lot 5 has 4.83 acres. <br /> <br />When recombined, the two developed parcels will each house a 60,000 s.f. 2 story <br />high tech building. However, only Phase 1 - the northern building - would be built <br />in 1998 forVeritas. The site is designated as Business in the Comprehensive Plan, <br />and is located in a PUD Zoning District. The proposed parcels are vacant at this <br />time. <br /> <br />2.2 Ryan Companies is requesting a minor subdivision to recombine the three lots into <br />two developable parcels and the remainder of Lot 5. As proposed, the northern <br />extension (98.8 feet) of Lot 4 would be combined with Lot 3. The remaining portion <br />of Lot 4 would be combined with the northern extension of Lot 5 (56 feet). <br /> <br />Currently (approx. acres) <br />Lot 3 (3.65 acres) <br />Lot 4 (3.08 acres) <br />Lot 5 (4.85 acres) <br /> <br />As Proposed (approx. acres) <br />Parcel 3 (4.08 acres) <br />Parcel 4 (2.98 acres) <br />Parcel 5 (4.52 acres) <br /> <br />PF#3013 - RCA (05/26/98) - Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.