Laserfiche WebLink
<br />existing stations will be necessary regardless of growth to serve existing residents and <br />employees. From a pure marginal perspective, therefore, new growth will not nec~ate thf' A J <br />need for additional fire station capital costs. ~ v0 ~ <br /> <br />It was also indicated that there would be no need for additional fire vehicles and e~:'::nt other 1 <br />than routine replacement at the end the useful life. ~fore. new growth will not necessitate <br />the need for w vehicles and equipment. Depreciation costs are included in the rowth related <br />operating costs (see SectiOn ,Part B). New growth will therefore contribute to the de re. n <br />costs of fire vehicles and equipment. ~~J}!\ ". I ~.. ~ <br /> <br />C. Public Works 01:\11-"';, fV'iX!; riY <br />1. Vehicles and Equipment <br /> <br /> <br />Based on discussions with department staff, there will be no additional road miles added to the <br />City from redevelopment and infill projects. There is therefore no need for additional vehicles <br />and equipment from new growth. <br /> <br />2. Public Works Buildings and Facilities <br /> <br />The Public Works Department currently operates out of a 52,000 square foot facility. Based on a <br />review of the crp and discussions with City staff, there are no plans for major building <br />renovation or construction and new building space will not be necessary to maintain the level of <br />service. Therefore, for purposes of the fiscal analysis, no Public Works building costs will be <br />incurred. <br /> <br />Page 30 <br /> <br />Tischler & Associates, Inc. <br />