My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03076
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3000
>
pf_03076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:32:25 PM
Creation date
12/8/2004 3:00:39 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3076
Planning Files - Type
Planning-Other
Address
2660 CIVIC CENTER DR
Applicant
CITY OF ROSEVILLE
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
674
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Roseville <br />Project No. CMXX-99-0290 <br />June 3, 1999 <br />Page 2 <br /> <br />. Interviews with local government officials or agencies having jurisdiction over hazardous <br />waste disposal or other environmental matters in the area of the Site. <br />. Preparing a written report of our methods and conclusions. <br /> <br />A.3. Assessment Limitations <br />The findings and conclusions presented in this report are based on the procedures described in the <br />ASTM Practice E 1527-97, informal discussions with various agencies, available literature cited in <br />this report, conditions noted at the time of our Phase I ESA, and our interpretation of the information <br />obtained as part of this Phase I ESA. Our findings and conclusions are limited to the specific project <br />and properties described in this report and by the accuracy and completeness of the information <br />provided by others. <br /> <br />An environmental site assessment cannot wholly eliminate uncertainty regarding the potential for <br />recognized environmental conditions in connection with a property. Performance of this practice is <br />intended to reduce, bu t not eliminate, uncertainty regarding the potential for recognized <br />environmental conditions in connection with a property within reasonable limits of time and cost. <br /> <br />In performing its services, Braun Intertec used that degree of care and skill ordinarily exercised <br />under similar circumstances by reputable members of its profession practicing in the same locality. <br />No other warranty is made or intended. <br /> <br />No intentional deviations from the ASTM Practice E 1527-97 were made iri the completion of this <br />Phase I ESA for the Site, except for the following: <br /> <br />. We did not enter the vault at the time of our reconnaissance due to possible safety concerns. <br />In addition, this was beyond the scope of the Phase I ESA. <br /> <br />The Scope of Services for this project did not include the completion of soil borings, the installation <br />of groundwater monitoring wells or the collection of soil or groundwater samples. Also, the Scope <br />of Services for this project did not include collecting or analyzing samples from the Site for the <br />presence of asbestos, PCBs, lead-based paint, lead in drinking water, radon or urea formaldehyde. <br /> <br />Braun Intertec did not review property tax files, recorded land title records or zoning land-use <br />records to document the first developed use of the Site. Past experience has indicated that these <br />historical sources are not sufficiently useful. <br />
The URL can be used to link to this page
Your browser does not support the video tag.