Laserfiche WebLink
<br />Roseville (including the rail line parallel to County Road "C". <br /> <br />1.4 The Comprehensive Plan parks and recreation pathway section also calls for pathway <br />connections throughout the community, especially off-road linkages between work and <br />home. Further, a map in Section 9, and in Appendix 12 illustrates a cross community <br />pathway parallel with the BN-County Road "C" rail line. <br /> <br />1.5 Ramsey County in 1989 completed a plan which identified the BN County Road "C" rail <br />right-of-way as a potential cross-county commuter or light rail line that should be <br />acquired if abandonment is ever sought by BN. In 1996, the Ramsey County Regional Rail <br />Authority adopted a resolution (#R96-09) which directed the Authority to negotiate for <br />the acquisition of the rail right-of-way. <br /> <br />1.6 The staff understands that BN has filed for an amendment to its federal Surface <br />Transportation Board abandonment application, that would eliminate the abandonment <br />within Ramsey County and the City of Roseville in order to sell off a parcel for reuse to an <br />adjacent, proposed warehouse building. It is not in the public's and City's interest to have <br />the rail right-of-way sold off in parcels that would severely reduce or eliminate the <br />continuity of a multi use commuter line and pathway/trail system. The Regional Rail <br />Authority should acquire this parcel with the intent of keeping the right-of-way parcels <br />in one ownership. The government agencies holding title could then determine if a short <br />term, interim lease, or easement should be issued to potential users adjacent to the rail. <br /> <br />1.5 The issue ofthe proposed George Wintz Triangle Warehouse subdivision of a parcel of <br />right-of-way from the BN rail line (the Triangle Warehouse, 35' by 703 feet or <br />approximately 24,000 sJ.) should not be approved by the City during the 180 review period <br />(through June, 1999) because of the impending County Rail Authority study and/or <br />acquisition of this right-of-way land. <br /> <br />2.0 Staff Recommendation <br /> <br />The staff recommends that the City Council direct staff to notify the applicant for the <br />minor subdivision commonly known as the Triangle Warehouse site that the subdivision <br />will be considered premature and incomplete until such time as the 180 day Federal <br />Surface Transportation Board RevIew of the abandonment proposal is completed. <br /> <br />3.0 Council Action <br /> <br />By resolution (draft attached), determine that the proposed Wintz subdivision is <br />premature and must await the outcome of the 180 day NSTB review period. <br /> <br />Attachment: Resolution re: time extension . <br />Q:\Planning Files\3105_ Wintz Warehouse\RCA(03.22.99).doc <br /> <br />Page 2 of2 <br />