Laserfiche WebLink
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: September 23, 2014 Item No: 4 <br />Item Description: Communication Items <br />Projects update: <br />• 2014 PMP- We are nearing completion of this project. The remaining work includes <br />paving Dellwood, some backyard drainage improvements near Dellwood and Sherren, <br />and directionally boring a new water main along Rice Street to complete a link near Lake <br />McCarrons. All work will be complete by the end of October. <br />• County Road B2 Sidewalk Construction — Last week the contractor poured concrete up to <br />Western Ave. The contractor expects to have the sidewalk poured up to Rice Street by the <br />first week of October, including the section along Victoria St. Restoration work is <br />ongoing. The project will be complete by the end of October. <br />• Snelling Ave Bus Rapid Transit: Final plans for this project are still under development. <br />Staff will see 90% plans by the first week of October. All of the stations will be under <br />construction in 2015 with the BRT service stating in late 2015. Staff was recently notified <br />that given current cost projections, Metro Transit has made the decision to drop the <br />Roselawn station from any further design stages. We were informed that the Roselawn <br />station was being "deferred" but the design was continuing in case project costs allowed <br />for the inclusion of the station. We now know that will not be a possibility. Staff will <br />continue to work with Metro Transit in the future to lobby for the construction of the <br />Roselawn station in a future phase of the BRT line. <br />County Road B Pathway: The pathway along County Road B has been paved. Crews will <br />be working on final restoration and the installation of the storm water BMP's over the <br />next couple of weeks. Some concrete work will also occur at the intersection of County <br />Road B and Cleveland for the installation of the ADA pedestrian ramps. <br />Victoria Street Reconstruction and Sidewalk Project: Staff is starting preliminary work <br />on next year's reconstruct project along Victoria Street south of County Road B. This <br />project will involve complete reconstruction of the roadway, curb and gutter installation <br />at various points, storm water improvements, as well as a new sidewalk The sidewalk <br />will extend north and tie into the new sidewalk at County Road B2. The City is working <br />with the County and their expected mill and overlay project on Victoria north of County <br />Road B to possibly narrow the roadway to make room for the sidewalk on the east side of <br />the roadway. Staff has scheduled a public meeting to introduce the project to area <br />residents and receive input about any specific issues along the roadway. That meeting <br />will be held at 7 PM on Thursday, October 9d' in Rose Room in the Oval Skating Center. <br />The City's water tower painting is complete. The tank will be refilled for testing on the <br />22nd and hopefully back in service on the 26th of September with good test results. <br />Mn/DOT will be presenting at the City Council work session on Monday, October 20' . <br />They will be focusing on the TH 36 bridge over Lexington Ave project as well as having <br />