My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03119
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3100
>
pf_03119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:41:23 PM
Creation date
12/8/2004 3:50:48 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
495
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.' <br /> <br />plantings, lighting, pathways, etc. Lexington Avenue currently has a capacity of 18,000 <br />vehicle trips per day, with a current use of 14,000 vehicles per day. County Road C also has <br />a capacity of approximately 18,000 vehicle trips per day, with current use of approximately <br />11,000 vehicle trips. By year 2020 Lexington is expected to increase to 17,000 trips, while <br />County Road C will increase to 14,500 trips. Turning lanes could increase the capacity at the <br />comer of Lexington and C. recognizing the many of the proposed uses already exist on the <br />city center site, there appears to be adequate capacity to serve the proposal. As new facilities <br />are proposed, the potential traffic should be re-examined. <br /> <br />3.4 Utilities are available and have capacity for any use the city center proposal anticipates. <br /> <br />4.0 STAFF RECOMMENDATION <br /> <br />Based on the findings outlined in Section 3 of this report, staff recommends further <br />discussion ofthe next steps in the refinement of this process - a type of Phase Two study to <br />do the detailed planning and financial analysis. <br /> <br />5.0 T ASK FORCE RECOMMENDATIONS <br /> <br />On December 16, 1999, the City Center Task Force by consensus, recommended <br />approval of the draft plan. <br /> <br />6.0 SUGGESTED ACTION <br /> <br />Provide discussion and direction for next steps of City Center process. <br /> <br />Attachment: Draft master Plan and Development Strategy <br /> <br />Q:\CITYCENT\PF3119-PCA(O 11700),doc <br /> <br />PF3119 - RCA (01/17/00) - Page 3 of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.