My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03119
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3100
>
pf_03119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:41:23 PM
Creation date
12/8/2004 3:50:48 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
495
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.. <br /> <br />Mr. Steve Sarkozy, City Manager <br />August 29, 2000 <br />Page 3 <br /> <br />This program documentation does not include assessment of condition of existing <br />buildings, nor does it include a description of the scope of required renovation. <br /> <br />,PROJECT SCHEDULE <br /> <br />It is anticipated this study will be completed over a ten- to twelve-week time period. The <br />following general schedule of activities and meetings are planned: <br /> <br />Week One <br />Project start-up meeting <br /> <br />Weeks Two, Three & Four <br />Departmental head interviews 1 initial data collection <br />Information compilation 1 analysis 1 organization <br />Preliminary program 1 scope 1 budget analysis <br /> <br />Weeks Five, Six & Seven <br />Project advisory group meeting 1 review - preliminary data <br />Departmental head information review & refinement 1 second data collection <br />Preliminary document update 1 draft program development <br />Draft cost 1 budget development <br />Draft phasing plan update development <br /> <br />Weeks Eight & Nine <br />Project advisory group meeting 1 review - complete draft documentation <br />Departmental head information review & refinement <br />Draft document update 1 refinement <br /> <br />Weeks Ten & Eleven <br />Project advisory group meeting 1 review - final draft <br />Final report preparation <br /> <br />Week Twelve <br />Project advisory group meeting 1 presentation - final report <br /> <br />. PROJECT DELIVERABLES <br /> <br />" A fiii.':ilconcept program document will be produced which includes the separate <br />documentation of the individual buildings and the other City Center project requirements <br />information developed. 15 copies of the 8 V2 x 11 inch bound report will be delivered. <br /> <br />A draft final report will be distributed prior to completion for review by the project <br />r~presentative and advisory group. <br /> <br />Other working papers will be distributed during the study process to facilitate discussion, <br />review and refinement. <br /> <br />- -------- <br />
The URL can be used to link to this page
Your browser does not support the video tag.