Laserfiche WebLink
<br />February 22, 2000 <br />Debra Bloom <br /> <br />Plan Review Comments <br />Veritas Software <br /> <br />Page 2 of2 <br /> <br />Stormwater Treatment/ Detention <br />· In the southeast corner of the site. you propose to install a new outlet to the existing pond. There <br />is an existing outlet already located in this area. The new outlet is at a higher elevation and the <br />outflow is directed toward the existing outlet We are concerned that this may cause erosion on <br />this slope. placing the existing outlet at risk. Please address this issue. <br /> <br />Easements required/ Existing easements: <br />· Easement should be dedicated for the proposed new storm sewer main. <br />. It appears that a corner of the temporary parking lot will be within the proposed replacement <br />easement Please revise the parking lot or the easement to ensure that this overlap does not occur. <br />. The proposed Overlook should not be in the pond easement <br />. In the southwest corner the pathway has a near 90 degree corner. This should be redraw with a <br />larger radius. Once the pathway is completed, an easement should be dedicated. <br /> <br />We look forward to working with you on your proposed development. If you have any questions about <br />these comments. please contact me at (651) 490-2221. <br /> <br />G: \Engi neeri ng\Deb \P Ianni ng\ veritas _ 2 _ 22 _ OO.doc <br />